ON THE BERTH ALLOCATION PROBLEM

被引:9
作者
Alzaabi, Shaikha Ahmed Jumaa [1 ]
Diabat, Ali [1 ]
机构
[1] Masdar Inst Sci & Technol, Dept Engn Syst & Management, Abu Dhabi, U Arab Emirates
关键词
Berth allocation problem; MIP formulation; container terminals; maritime logistics; CRANE SCHEDULING PROBLEM; ASSIGNMENT; ALGORITHM;
D O I
10.1051/ro/2015029
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The rapid growth of the maritime industry has created a need for improvement in container terminal operations, by effectively utilizing the available resources. One of the most important seaside planning problems that has received considerable attention in the literature is the assignment of quay space to vessels, commonly referred to as the Berth Allocation Problem (BAP). Despite the significant contributions to the BAP found in the literature, there are certain important requirements that have not been considered. These include vessels of different sizes, suitability of a berth to a vessel, known as service requirement, and the possibility for one vessel to be accommodated by more than one berth. Thus, we formulate a mixed integer program (MIP) that explicitly considers these factors, in order to produce more realistic results. The model assumes that the quay is partitioned into berths of the same size and that several berths can be assigned to one vessel, given that the vessel is too long to be accommodated by a single berth. Considering the possibility of occupation of several berths by one vessel implies that the sequence of berths occupied is valid and feasible. In addition, we consider two extensions; the first extension of the model accounts for the different service requirements of each vessel, while the second assumes different berth lengths. A preliminary computational analysis is conducted to test the effectiveness of the proposed models and provide useful insights to port operators.
引用
收藏
页码:491 / 501
页数:11
相关论文
共 25 条
[1]  
Al-Dhaheri N., 2016, ANN OPER RE IN PRESS
[2]   A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty [J].
Al-Dhaheri, Noura ;
Jebali, Aida ;
Diabat, Ali .
SIMULATION MODELLING PRACTICE AND THEORY, 2016, 66 :122-138
[3]   The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints [J].
Al-Dhaheri, Noura ;
Jebali, Aida ;
Diabat, Ali .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 94 :230-244
[4]   The Quay Crane Scheduling Problem [J].
Al-Dhaheri, Noura ;
Diabat, Ali .
JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 :87-94
[5]   AN INTEGRATED BERTH ALLOCATION AND YARD ASSIGNMENT PROBLEM FOR BULK PORTS: FORMULATION AND CASE STUDY [J].
Al-Hammadi, Jasem ;
Diabat, Ali .
RAIRO-OPERATIONS RESEARCH, 2017, 51 (01) :267-284
[6]   A follow-up survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) :675-689
[7]   An Integrated Quay Crane Assignment and Scheduling Problem [J].
Diabat, Ali ;
Theodorou, Effrosyni .
COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 73 :115-123
[8]   Berth allocation considering fuel consumption and vessel emissions [J].
Du, Yuquan ;
Chen, Qiushuang ;
Quan, Xiongwen ;
Long, Lei ;
Fung, Richard Y. K. .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2011, 47 (06) :1021-1037
[9]   A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem [J].
Fu, Yi-Min ;
Diabat, Ali .
APPLIED MATHEMATICAL MODELLING, 2015, 39 (3-4) :1194-1201
[10]   A multi-vessel quay crane assignment and scheduling problem: Formulation and heuristic solution approach [J].
Fu, Yi-Min ;
Diabat, Ali ;
Tsai, I-Tsung .
EXPERT SYSTEMS WITH APPLICATIONS, 2014, 41 (15) :6959-6965