GRAPH-MATRIX MODELING OF PRODUCTION SYSTEMS AS A BASIS FOR MANAGING THE PRODUCTION CAPACITY OF METAL WORKING ENTERPRISES

被引:0
作者
Kireeva, N. V. [1 ]
Zambrzhitskaia, E. S. [2 ]
Voinov, S. S. [3 ]
机构
[1] Acad Labor & Social Relat, Branch Educ Inst Trade Unions Higher Educ, Ural Social & Econ Inst, Dept Econ, Chelyabinsk, Russia
[2] Nosov Magnitogorsk State Tech Univ, Dept Econ, Magnitogorsk, Russia
[3] Magnitogorsk Factory Precis Prod, Magnitogorsk, Russia
来源
CIS IRON AND STEEL REVIEW | 2021年 / 21卷
关键词
metal working enterprise; production capacity; production system; production link; throughput; assortment structure; limiting" link; graph-matrix model; matrix; production network; GLOBAL VALUE CHAINS; INNOVATION;
D O I
10.17580/cisisr.2021.01.17
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
Development of information systems and technologies makes it possible to use complex models for information support of management decisions. The most particular interest shows the theory of graphs and matrix calculus in order to assess the production capacity of an industrial enterprise. The study of the authors is devoted to development of methodological approaches to assessing of production capacity based on graph-matrix models. The essence of these models lies in the fact that a manufacturing enterprise is depersonaliird by perceiving it as a kind of production system, consisting of production links that add up to a production chain and form a kind of production network, which is represented as a model of the production cycle. In order to perform the appropriate calculations, the specified graph model is linked to the matrix model, which takes into account the main parameters of the production system: technological connections; assortment structure of products; direct consumption coefficients; production capacity of the links. Suggested approach determines the flexibility and broad analytical capabilities of the proposed models for calculating of production capacities. The basis for theoretical and methodological researches became the methods of analysis and synthesis, principles of consistency and complexity, graph theory and matrix calculus. The approbation of the proposed graph-matrix models of production systems was carried out using the examples of a metal working enterprise. The theoretical and practical significance of the study lies in the fact that the proposed graph-matrix model makes it possible to ensure effective management of production facilities by taking into account the mobility of the product assortment structure and complex technological links.
引用
收藏
页码:98 / 102
页数:5
相关论文
共 19 条
[1]   Innovation performance and influencing factors of low-carbon technological innovation under the global value chain: A case of Chinese manufacturing industry [J].
Bi, Kexin ;
Huang, Ping ;
Wang, Xiangxiang .
TECHNOLOGICAL FORECASTING AND SOCIAL CHANGE, 2016, 111 :275-284
[2]  
Danilov G. V., 2012, EKONOMICHESKIY ANALI, P18
[3]  
Danilov G. V., 2012, EKONOMICHESKIY ANALI, P40
[4]  
[Данилов Геннадий Владимирович Danilov Gennady Vladimirovich], 2012, [Вестник Магнитогорского государственного технического университета им. Г.И. Носова, Vestnik Magnitogorskogo gosudarstvennogo tekhnicheskogo universiteta im. G.I. Nosova], P79
[5]   Creative tension in a lean work environment: Implications for logistics firms and workers [J].
de Haan, J. ;
Naus, F. ;
Overboom, M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 137 (01) :157-164
[6]   STRATEGIES FOR INCREASING PRODUCTIVITY IN PRODUCTION SYSTEMS [J].
de Jesus Pacheco, Diego Augusto ;
Pergher, Isaac ;
Jung, Carlos Fernando ;
ten Caten, Carla Scwenberg .
INDEPENDENT JOURNAL OF MANAGEMENT & PRODUCTION, 2014, 5 (02) :344-359
[7]   The impact of capacity-reduction initiatives on the stock market value of Chinese manufacturing firms [J].
Fan, Di ;
Liang, Tianheng ;
Yeung, Andy C. L. ;
Zhang, Haomin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 223
[8]   Facilities management: the strategic selection of a maintenance system [J].
Fraser, Kym .
JOURNAL OF FACILITIES MANAGEMENT, 2014, 12 (01) :18-+
[9]   Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems [J].
Georgiadis, Patroklos ;
Politou, Alexandra .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (04) :689-703
[10]  
Kislitsyna O. A, 2017, ROSSIYSKOE PREDPRINI