Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information

被引:24
作者
Liberopoulos, G [1 ]
Koukoumialos, S [1 ]
机构
[1] Univ Thessaly, Dept Mech & Ind Engn, Volos, Greece
关键词
production/inventory control; advance demand information; planned supply lead time; base stock; kanban;
D O I
10.1016/j.ijpe.2004.04.006
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We numerically investigate tradeoffs between near-optimal base stock levels, numbers of kanbans, and planned supply lead times in base stock policies and hybrid base stock/kanban policies with advance demand information used for the control of multi-stage production/inventory systems. We report simulation-based computational experience regarding such tradeoffs and the managerial insights behind them for single-stage and two-stage production/inventory systems. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:213 / 232
页数:20
相关论文
共 33 条