A metaheuristic algorithm and simulation to study the effect of learning or tiredness on sequence-dependent setup times in a parallel machine scheduling problem

被引:21
|
作者
Exposito-Izquierdo, Christopher [1 ]
Angel-Bello, Francisco [2 ]
Melian-Batista, Belen [1 ]
Alvarez, Ada [3 ]
Baez, Sarahi [2 ]
机构
[1] Univ La Laguna, IUDR, Dept Ingn Informat & Sistemas, San Cristobal la Laguna, Spain
[2] Tecnol & Monterrey, Escuela Ingn & Ciencias, Monterrey, Mexico
[3] Univ Autonoma Nuevo Leon, Fac Ingn Mecan & Elect, San Nicolas De Los Garza, Mexico
关键词
Parallel machine scheduling; Total completion time; Sequence-dependent setups; Learning effect; Tiredness effect; Simulation; TOTAL COMPLETION-TIME; FORMULATIONS; SYSTEM; RULES;
D O I
10.1016/j.eswa.2018.09.041
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This work analyses the effects of learning or tiredness on the setup times in a scheduling problem with identical parallel machines. This problem involves setup times that depend on the sequence of jobs with the goal of minimizing the sum of total completion times. Due to the complexity of the problem and the assumption that high-quality solutions of the problem without effects are also high-quality solutions when these effects are considered, we firstly propose a metaheuristic algorithm aimed at finding high-quality and diverse solutions, ignoring the learning/tiredness issues. Then, we study the effects of learning or tiredness on the obtained solutions in a real-world scenario by using a multi-agent simulation approach. The computational experiments carried out demonstrate that the simulation model developed in this work is valid to handle randomness in a practical scenario, allowing to be adapted to different learning or tiredness effects. Furthermore, the computational experiments underscore the fact that the proposal can be used as a decision support tool aimed at estimating the amount of job to be assigned to the available machines on the basis of the operator profile. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:62 / 74
页数:13
相关论文
共 50 条
  • [31] Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
    Rocha, Pedro Leite
    Ravetti, Martin Gomez
    Mateus, Geraldo Robson
    Pardalos, Panos M.
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (04) : 1250 - 1264
  • [32] New benchmark algorithms for No-wait Flowshop Group Scheduling Problem with Sequence-Dependent Setup Times
    Cheng, Chen-Yang
    Pourhejazy, Pourya
    Ying, Kuo-Ching
    Liao, Yi-Hsiu
    APPLIED SOFT COMPUTING, 2021, 111
  • [33] A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates
    Gharehgozli, A. H.
    Tavakkoli-Moghaddam, R.
    Zaerpour, N.
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2009, 25 (4-5) : 853 - 859
  • [34] Uniform Parallel Machine Scheduling with Sequence Dependent Setup Times: A Randomized Heuristic
    Yildiz, Beste
    Kandiller, Levent
    Toy, Ayhan Ozgur
    DIGITIZING PRODUCTION SYSTEMS, ISPR2021, 2022, : 812 - 825
  • [35] Hybrid Pareto artificial bee colony algorithm for multi-objective single machine group scheduling problem with sequence-dependent setup times and learning effects
    Yue, Lei
    Guan, Zailin
    Saif, Ullah
    Zhang, Fei
    Wang, Hao
    SPRINGERPLUS, 2016, 5
  • [36] Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects
    Hsu, Chou-Jung
    Kuo, Wen-Hung
    Yang, Dar-Li
    APPLIED MATHEMATICAL MODELLING, 2011, 35 (03) : 1492 - 1496
  • [37] Comments on "A bicriteria parallel machine scheduling with a learning effect of setup and removal times"
    Xu, Dehua
    Yin, Yunqiang
    APPLIED MATHEMATICAL MODELLING, 2011, 35 (07) : 3648 - 3650
  • [38] Time-dependent formulations for minimizing total completion time in a parallel machine scheduling problem with dependent setup times
    Baez, Sarahi
    Angel-Bello, Francisco
    Alvarez, Ada
    IFAC PAPERSONLINE, 2016, 49 (12): : 857 - 862
  • [39] Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
    Behnamian, J.
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (05) : 1415 - 1438
  • [40] Bi-Criterion Single Machine Scheduling Problem with a Past-Sequence-Dependent Setup Times and Learning Effect
    Chen, S. H.
    Mani, V.
    Chen, Y. H.
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 185 - 189