On the Influence of Weather Forecast Errors in Short-Term Load Forecasting Models

被引:74
作者
Fay, Damien [1 ]
Ringwood, John V. [2 ]
机构
[1] Univ Cambridge, Comp Lab, NETOS Grp, Cambridge, England
[2] Natl Univ Ireland, Maynooth, Kildare, Ireland
关键词
Load forecasting; model combination; neural networks; weather forecast errors;
D O I
10.1109/TPWRS.2009.2038704
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Weather information is an important factor in load forecasting models. Typically, load forecasting models are constructed and tested using actual weather readings. However, online operation of load forecasting models requires the use of weather forecasts, with associated weather forecast errors. These weather forecast errors inevitably lead to a degradation in model performance. This is an important factor in load forecasting but has not been widely examined in the literature. The main aim of this paper is to present a novel technique for minimizing the consequences of this degradation. In addition, a supplementary technique is proposed to model weather forecast errors to reflect current accuracy. The proposed technique utilizes a combination of forecasts from several load forecasting models (sub-models). The parameter estimation may thus be split into two parts: sub-model and combination parameter estimation. It is shown that the lowest PMSE corresponds to training the sub-models with actual weather but training the combiner with forecast weather.
引用
收藏
页码:1751 / 1758
页数:8
相关论文
共 28 条
[1]  
Bates J. M, 2001, The Combination of Forecasts, P391
[2]  
Chen HJ, 2005, IEEE POWER ENG SOC, P190
[3]   WEATHER SENSITIVE SHORT-TERM LOAD FORECASTING USING NONFULLY CONNECTED ARTIFICIAL NEURAL NETWORK [J].
CHEN, ST ;
YU, DC ;
MOGHADDAMJO, AR ;
LU, CN ;
VEMURI, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (03) :1098-1105
[4]   The impacts of temperature forecast uncertainty on Bayesian load forecasting [J].
Douglas, AP ;
Breipohl, AM ;
Lee, FN ;
Adapa, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (04) :1507-1513
[5]  
FAN S, 2008, P IND COMM POW SYST, P1
[6]   24-h electrical load data - a sequential or partitioned time series? [J].
Fay, D ;
Ringwood, JV ;
Condon, M ;
Kelly, M .
NEUROCOMPUTING, 2003, 55 (3-4) :469-498
[7]  
Gelb A., 1989, Applied Optimal Estimation
[8]  
Hamilton J. D., 2020, TIME SERIES ANAL
[9]  
Harvey A.C., 1994, FORECASTING STRUCTUR
[10]   To combine or not to combine: selecting among forecasts and their combinations [J].
Hibon, M ;
Evgeniou, T .
INTERNATIONAL JOURNAL OF FORECASTING, 2005, 21 (01) :15-24