A canvas model for risk assessment and performance estimation in public-private partnerships

被引:16
作者
Kuru, Kadir [1 ]
Artan, Deniz [1 ]
机构
[1] Istanbul Tech Univ, Dept Civil Engn, Div Construct Management, Istanbul, Turkey
关键词
Public-private partnerships (PPP); risk assessment; performance estimation; risk factors; critical success factors; compensation mechanisms; contract drafting; analytical hierarchy process (AHP); CRITICAL SUCCESS FACTORS; INFRASTRUCTURE PROJECTS; PPP PROJECTS; CONSTRUCTION PROJECTS; POLITICAL RISKS; CHINA; ALLOCATION; RANKING; CSFS;
D O I
10.1080/15623599.2020.1763898
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Public-private partnership (PPP) is being widely used to meet the growing infrastructure and service demand. However, previous literature draws attention to distressed or failed PPP projects due to significant risks. In the quest for assessing risks and estimating the performance at the outset of a project, there is a need for a practical tool allowing in-depth analysis of the project conditions. This paper aims to develop a PPP Canvas which enables assessment of the project risk factors and determining the related compensation mechanisms that can be used to mitigate these risks or allocate them to the parties in a balanced way. The Canvas also helps to estimate a project performance score based on the significance coefficients determined by the Analytical Hierarchy Process. AHP results show that stability of economic environment, political support and government intervention are the most important risk factors in the local context. AHP can be repeated for each specific PPP project, as part of the PPP Canvas process, to foster discussion and analysis of the risks and compensation mechanisms across different geographical locations and PPP project types. The paper adds a new dimension to PPP risk assessment by making use of the Business Model Canvas approach and the inclusion of contractual compensation and penalty mechanisms. As the stakeholders become more informed of the project conditions and the risks involved, they can make better decisions throughout the project life-cycle and can benefit from the identified compensation mechanisms in contract drafting.
引用
收藏
页码:704 / 719
页数:16
相关论文
共 50 条
[41]   Exploring the challenges in the development of retirement village homes through Public-Private Partnerships [J].
Osei-Kyei, Robert ;
Tam, Vivian ;
Ma, Mingxue ;
Tijani, Bashir .
JOURNAL OF HOUSING AND THE BUILT ENVIRONMENT, 2022, 37 (04) :2059-2077
[42]   The public-private partnerships in healthcare sector in China [J].
Liu Bo ;
Shi Leiyu ;
Min Hanyi ;
Liang Hailun ;
Dong Jiahong .
慢性疾病与转化医学(英文), 2023, 09 (04)
[43]   RISK MANAGEMENT PRACTICE IN CHINA'S PUBLIC-PRIVATE PARTNERSHIP PROJECTS [J].
Ke, Yongjian ;
Wang, ShouQing ;
Chan, Albert P. C. .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (05) :675-684
[44]   A performance measurement system for public-private partnerships: integrating stakeholder influence and process trans-period effect [J].
Wang, Dan ;
Wang, Xueqing ;
Wang, Lu ;
Liu, Henry J. ;
Jia, Xiajie .
INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2023, 72 (01) :137-155
[45]   The Application of Public-private Partnerships Model in the Area of Rural Infrastructure Construction [J].
Gao Ming .
PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (6TH), VOL III, 2010, :345-350
[46]   Public-private partnerships: A dynamic discrete choice model for road projects [J].
Zhao, Jianfeng ;
Liu, Henry J. ;
Love, Peter E. D. ;
Greenwood, David J. ;
Sing, Michael C. P. .
SOCIO-ECONOMIC PLANNING SCIENCES, 2022, 82
[47]   Critical success factors of Public-Private Partnerships in the education sector [J].
Sajida ;
Kusumasari, Bevaola .
PUBLIC ADMINISTRATION AND POLICY-AN ASIA-PACIFIC JOURNAL, 2023, 26 (03) :309-320
[48]   Foreignness in public-private partnerships: The case of project finance investments [J].
Dykes, Bernadine J. ;
Stevens, Charles E. ;
Lahiri, Nandini .
JOURNAL OF INTERNATIONAL BUSINESS POLICY, 2020, 3 (02) :183-197
[49]   Exploring the drivers of concession period in transport public-private partnerships [J].
Mangano, Giulio ;
Castelblanco, Gabriel ;
De Marco, Alberto ;
Ottaviani, Filippo Maria .
BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2025, 15 (02) :193-210
[50]   Identifying Measures of Effective Risk Management for Public-Private Partnership Infrastructure Projects in Developing Countries [J].
Mazher, Khwaja Mateen ;
Chan, Albert P. C. ;
Choudhry, Rafiq M. ;
Zahoor, Hafiz ;
Edwards, David J. ;
Ghaithan, Ahmed M. ;
Mohammed, Awsan ;
Aziz, Mubashir .
SUSTAINABILITY, 2022, 14 (21)