A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock

被引:54
作者
Shakeri, Mojtaba [1 ]
Low, Malcolm Yoke Hean [2 ]
Turner, Stephen John [1 ]
Lee, Eng Wah [3 ]
机构
[1] Nanyang Technol Univ, Sch Comp Engn, Singapore 639798, Singapore
[2] D SIMLAB Technol Pte Ltd, Singapore 609434, Singapore
[3] Singapore Inst Mfg Technol, Singapore 638075, Singapore
关键词
Crossdocking; Truck scheduling; Practicality; Feasibility; Heuristics; DOCK ASSIGNMENT PROBLEM; OPERATIONAL TIME CONSTRAINT; MAKESPAN;
D O I
10.1016/j.cor.2012.01.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper studies truck scheduling in a resource-constrained crossdock. The problem decides on the sequence of incoming and outgoing trucks at the dock doors of the crossdocking terminal, subject to the availability of crossdock resources including dock doors and material handling systems. The resources are assumed non-preemptive making it necessary to address the feasibility of the problem before its optimality as it might be entrapped in deadlock and no feasible solution is produced. The paper thus aims at developing an algorithmic approach capable of establishing solution feasibility for truck scheduling problem instances of various types and difficulty levels which at the same time can be readily implemented in an industrial setting. The proposed approach is a two-phase heuristic algorithm where in the first phase, a heuristic search is deployed to construct a feasible sequence of trucks for the assignment to dock doors and in the second, a rule-based heuristic is used to assign each sequenced truck to a proper dock door, subject to a limited number of forklifts, such that significant savings in the truck schedule length are achieved. Extensive experiments are conducted to evaluate the efficiency of the algorithm in terms of deadlock avoidance and solution quality. The evaluation is carried out against the solutions generated by the exact mathematical model of the problem and a constructive heuristic developed for a similar truck scheduling problem. Experimental results demonstrate that the proposed algorithm is robust in avoiding deadlock and generates feasible solutions for the instances where the other two approaches cannot. Furthermore, significant improvement in the solution quality is achieved by augmenting the algorithm to a re-starting heuristic. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2564 / 2577
页数:14
相关论文
共 26 条
[1]   Crossdocking-Just in Time scheduling: an alternative solution approach [J].
Alvarez-Perez, G. A. ;
Gonzalez-Velarde, J. L. ;
Fowler, J. W. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (04) :554-564
[2]   The best shape for a crossdock [J].
Bartholdi, JJ ;
Gue, KR .
TRANSPORTATION SCIENCE, 2004, 38 (02) :235-244
[3]  
Bermudez R, 2001, MBTC1102 U ARK
[4]   Scheduling inbound and outbound trucks at cross docking terminals [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
OR SPECTRUM, 2010, 32 (01) :135-161
[5]   Optimizing inbound and outbound door assignments in less-than-truckload crossdocks [J].
Bozer, Yavuz A. ;
Carlo, Hector J. .
IIE TRANSACTIONS, 2008, 40 (11) :1007-1018
[6]   Minimizing makespan in two-stage hybrid cross docking scheduling problem [J].
Chen, Feng ;
Song, Kailei .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (06) :2066-2073
[7]   Minimizing the makespan in a two-machine cross-docking flow shop problem [J].
Chen, Feng ;
Lee, Chung-Yee .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 193 (01) :59-72
[8]  
Cohen Y, 2008, INTERNATIONAL CONFERENCE ON INDUSTRIAL LOGISTICS (ICIL 2008): LOGISTICS IN A FLAT WORLD: STRATEGY, MANAGEMENT AND OPERATIONS, P1
[9]  
Cohen Yuval, 2009, International Journal of Logistics Systems and Management, V5, P574, DOI 10.1504/IJLSM.2009.024253
[10]   The effects of trailer scheduling on the layout of freight terminals [J].
Gue, KR .
TRANSPORTATION SCIENCE, 1999, 33 (04) :419-428