Real-time prediction of rock mass classification based on TBM operation big data and stacking technique of ensemble learning

被引:128
作者
Hou, Shaokang [1 ]
Liu, Yaoru [1 ]
Yang, Qiang [1 ]
机构
[1] Tsinghua Univ, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
Tunnel boring machine (TBM) operation data; Rock mass classification; Stacking ensemble learning; Sample imbalance; Synthetic minority oversampling technique (SMOTE); PERFORMANCE PREDICTION; GEOLOGICAL CONDITIONS; TUNNEL; FRAMEWORK; SELECTION; AGREEMENT; MODEL;
D O I
10.1016/j.jrmge.2021.05.004
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Real-time prediction of the rock mass class in front of the tunnel face is essential for the adaptive adjustment of tunnel boring machines (TBMs). During the TBM tunnelling process, a large number of operation data are generated, reflecting the interaction between the TBM system and surrounding rock, and these data can be used to evaluate the rock mass quality. This study proposed a stacking ensemble classifier for the real-time prediction of the rock mass classification using TBM operation data. Based on the Songhua River water conveyance project, a total of 7538 TB M tunnelling cycles and the corresponding rock mass classes are obtained after data preprocessing. Then, through the tree-based feature selection method, 10 key TBM operation parameters are selected, and the mean values of the 10 selected features in the stable phase after removing outliers are calculated as the inputs of classifiers. The preprocessed data are randomly divided into the training set (90%) and test set (10%) using simple random sampling. Besides stacking ensemble classifier, seven individual classifiers are established as the comparison. These classifiers include support vector machine (SVM), k-nearest neighbors (KNN), random forest (RF), gradient boosting decision tree (GBDT), decision tree (DT), logistic regression (LR) and multilayer perceptron (MLP), where the hyper-parameters of each classifier are optimised using the grid search method. The prediction results show that the stacking ensemble classifier has a better performance than individual classifiers, and it shows a more powerful learning and generalisation ability for small and imbalanced samples. Additionally, a relative balance training set is obtained by the synthetic minority oversampling technique (SMOTE), and the influence of sample imbalance on the prediction performance is discussed. (C) 2022 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V.
引用
收藏
页码:123 / 143
页数:21
相关论文
共 84 条
  • [21] Feurer M, 2019, SPRING SER CHALLENGE, P3, DOI 10.1007/978-3-030-05318-5_1
  • [22] Greedy function approximation: A gradient boosting machine
    Friedman, JH
    [J]. ANNALS OF STATISTICS, 2001, 29 (05) : 1189 - 1232
  • [23] Stochastic gradient boosting
    Friedman, JH
    [J]. COMPUTATIONAL STATISTICS & DATA ANALYSIS, 2002, 38 (04) : 367 - 378
  • [24] Ganganwar V., 2012, International Journal of Emerging Technology and Advanced Engineering, V2, P42
  • [25] Improved RMR Rock Mass Classification Using Artificial Intelligence Algorithms
    Gholami, Raoof
    Rasouli, Vamegh
    Alimoradi, Andisheh
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2013, 46 (05) : 1199 - 1209
  • [26] TBM tunnelling under adverse geological conditions: An overview
    Gong, Qiuming
    Yin, Lijun
    Ma, Hongsu
    Zhao, Jian
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 57 : 4 - 17
  • [27] Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP
    Hamidi, Jafar Khademi
    Shahriar, Kourosh
    Rezai, Bahram
    Rostami, Jamal
    Bejari, Hadi
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2010, 69 (04) : 523 - 532
  • [28] Examining the effect of adverse geological conditions on jamming of a single shielded TBM in Uluabat tunnel using numerical modeling
    Hasanpour, Rohola
    Schmitt, Juergen
    Ozcelik, Yilmaz
    Rostami, Jamal
    [J]. JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2017, 9 (06) : 1112 - 1122
  • [29] A new hard rock TBM performance prediction model for project planning
    Hassanpour, J.
    Rostami, J.
    Zhao, J.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2011, 26 (05) : 595 - 603
  • [30] Hoek E., 1994, ISRM NEW J, V2, P4, DOI DOI 10.1201/B16978-11