Stress and deformation analysis of gob-side pre-backfill driving procedure of longwall mining: a case study

被引:25
作者
Wu, Rui [1 ]
Zhang, Penghui [1 ]
Kulatilake, Pinnaduwa H. S. W. [1 ]
Luo, Hao [1 ]
He, Qingyuan [2 ]
机构
[1] Jiangxi Univ Sci & Technol, Sch Resources & Environm Engn, Ganzhou 341000, Peoples R China
[2] China Univ Min & Technol, Sch Mines, State Key Lab Coal Resources & Safe Min, Xuzhou 221116, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Gob-side pre-backfill driving procedure; Floor heave; Roadway stability; Stress distribution; Abutment pressure; FLOOR HEAVE; ENTRY; DESIGN; BODY;
D O I
10.1007/s40789-021-00460-2
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
At present, non-pillar entry protection in longwall mining is mainly achieved through either the gob-side entry retaining (GER) procedure or the gob-side entry driving (GED) procedure. The GER procedure leads to difficulties in maintaining the roadway in mining both the previous and current panels. A narrow coal pillar about 5-7 m must be left in the GED procedure; therefore, it causes permanent loss of some coal. The gob-side pre-backfill driving (GPD) procedure effectively removes the wasting of coal resources that exists in the GED procedure and finds an alternative way to handle the roadway maintenance problem that exists in the GER procedure. The FLAC(3D) software was used to numerically investigate the stress and deformation distributions and failure of the rock mass surrounding the previous and current panel roadways during each stage of the GPD procedure which requires "twice excavation and mining". The results show that the stress distribution is slightly asymmetric around the previous panel roadway after the "primary excavation". The stronger and stiffer backfill compared to the coal turned out to be the main bearing body of the previous panel roadway during the "primary mining". The highest vertical stresses of 32.6 and 23.1 MPa, compared to the in-situ stress of 10.5 MPa, appeared in the backfill wall and coal seam, respectively. After the "primary mining", the peak vertical stress under the coal seam at the floor level was slightly higher (18.1 MPa) than that under the backfill (17.8 MPa). After the "secondary excavation", the peak vertical stress under the coal seam at the floor level was slightly lower (18.7 MPa) than that under the backfill (19.8 MPa); the maximum floor heave and maximum roof sag of the current panel roadway were 252.9 and 322.1 mm, respectively. During the "secondary mining", the stress distribution in the rock mass surrounding the current panel roadway was mainly affected by the superposition of the front abutment pressure from the current panel and the side abutment pressure from the previous panel. The floor heave of the current panel roadway reached a maximum of 321.8 mm at 5 m ahead of the working face; the roof sag increased to 828.4 mm at the working face. The peak abutment pressure appeared alternately in the backfill and the coal seam during the whole procedure of "twice excavation and mining" of the GPD procedure. The backfill provided strong bearing capacity during all stages of the GPD procedure and exhibited reliable support for the roadway. The results provide scientific insight for engineering practice of the GPD procedure.
引用
收藏
页码:1351 / 1370
页数:20
相关论文
共 32 条
[1]   Prediction of face advance rate and determination of the operation efficiency in retreat longwall mining panel using rock engineering system [J].
Aghababaei, Sajjad ;
Jalalifar, Hossein ;
Saeedi, Gholamreza .
INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2019, 6 (03) :419-429
[2]   Research on the width of filling body in gob-side entry retaining with high-water materials [J].
Chang Qingliang ;
Tang Weijun ;
Xu Ying ;
Zhou Huaqiang .
INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2018, 28 (03) :519-524
[3]   Non-harmonious deformation controlling of gob-side entry in thin coal seam under dynamic pressure [J].
Fan, Kegong ;
Liang, Hongguang ;
Ma, Chishuai ;
Zang, Chuanwei .
JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2014, 6 (03) :269-274
[4]   Stress environment of entry driven along gob-side through numerical simulation incorporating the angle of break [J].
Feng, Guorui ;
Wang, Pengfei .
INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2020, 30 (02) :189-196
[5]   Multiple and Long-Term Disturbance of Gob-Side Entry Retaining by Grouped Roof Collapse and an Innovative Adaptive Technology [J].
Han, Changliang ;
Zhang, Nong ;
Xue, Junhua ;
Kan, Jiaguang ;
Zhao, Yiming .
ROCK MECHANICS AND ROCK ENGINEERING, 2019, 52 (08) :2761-2773
[6]  
Hua X., 2006, Coal Sci Technol, P78, DOI DOI 10.3969/J.ISSN.0253-2336.2006.12.027
[7]   The reasonable breaking location of overhanging hard roof for directional hydraulic fracturing to control strong strata behaviors of gob-side entry [J].
Huang, Bingxiang ;
Liu, Jiangwei ;
Zhang, Quan .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2018, 103 :1-11
[8]  
[姜鹏飞 Jiang Pengfei], 2016, [采矿与安全工程学报, Journal of Mining & Safety Engineering], V33, P56
[9]   Fluidized mining and in-situ transformation of deep underground coal resources: a novel approach to ensuring safe, environmentally friendly, low-carbon, and clean utilisation [J].
Ju, Yang ;
Zhu, Yan ;
Xie, Heping ;
Nie, Xiaodong ;
Zhang, Yong ;
Lu, Chang ;
Gao, Feng .
INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2019, 6 (02) :184-196
[10]  
Kang HP, 2010, ROCK SOIL MECH, V31, P827