Development of an Agent-Based Collaborative Production System Based on Real-Time Order-Driven Approach

被引:4
作者
Ni, Yanting [1 ]
Wang, Yi [2 ]
机构
[1] Chengdu Univ, Sch Ind Mfg, Chengdu 610106, Peoples R China
[2] Siemens Corp China Ltd, Mfg Dept, Chengdu 610065, Peoples R China
基金
中国国家自然科学基金;
关键词
Production planning; Scheduling; Semiconductor manufacturing; Multi-agent system; Real-time order; MANUFACTURING SYSTEMS; MULTIAGENT SYSTEMS; MANAGEMENT; ENVIRONMENT; INTEGRATION; ALGORITHMS; DESIGN; STATE; ART;
D O I
10.1007/s13369-015-1572-6
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
With high variation of ordering in current marketing environment, the collaboration of dynamic production planning and scheduling strategies is becoming critical for manufacturers to make quick and correct decisions. On the basis of the complex and distributed semiconductor manufacturing system environment, it is imperative to consider the external disturbances on production scheduling and solve the related issues. However, current researches mostly focus on the collaboration issues within factory internal hierarchy, and lots of methods are discussed on the job sequence or order fulfillment problems on the work cells. Toward this end, a real-time order-driven (RTOD) approach is introduced to assist manufacturers in responding to real-time orders and reflecting them into collaborative production planning and scheduling. An agent-based heterarchical model is established to modularize the collaboration process of planning and scheduling accordingly. A distributed algorithm is provided to quantify the different scenarios during the collaboration, and three sub-algorithms are discussed in detail. Subsequently, the interaction process of each agent is discussed to identify the solutions paths in accordance with the proposed algorithms specifically. A case study is conducted in S semiconductor factory. A Java Agent Development Frameworks platform is developed to simulate the presented collaborative system, and two numerical experiments testified the effectiveness of RTOD approach accordingly.
引用
收藏
页码:1239 / 1253
页数:15
相关论文
共 20 条
[1]   A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull [J].
Baker, AD .
JOURNAL OF MANUFACTURING SYSTEMS, 1998, 17 (04) :297-320
[2]   Agent-based collaborative product design engineering: An industrial case study [J].
Hao, Q ;
Shen, WM ;
Zhang, Z ;
Park, SW ;
Lee, JK .
COMPUTERS IN INDUSTRY, 2006, 57 (01) :26-38
[3]   Multi-agent job shop scheduling system based on co-operative approach of idle time minimisation [J].
Kouider, Ahmed ;
Bouzouia, Brahim .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (02) :409-424
[4]  
Kumar P. R., 1993, Queueing Systems Theory and Applications, V13, P87, DOI 10.1007/BF01158930
[5]   Multi-agent systems applications in manufacturing systems and supply chain management: a review paper [J].
Lee, J. -H. ;
Kimz, C. -O. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (01) :233-265
[6]   Multiple-objective scheduling and real-time dispatching for the semiconductor manufacturing system [J].
Lee, Y. F. ;
Jiang, Z. B. ;
Liu, H. R. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (03) :866-884
[7]   Development of a multi-agent-based distributed simulation platform for semiconductor manufacturing [J].
Lin, Jie ;
Long, Qingqi .
EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (05) :5231-5239
[8]   Agent-based dynamic integrated process planning and scheduling in flexible manufacturing systems [J].
Nejad, Hossein Tehrani Nik ;
Sugimura, Nobuhiro ;
Iwamura, Koji .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (05) :1373-1389
[9]   An approach for integration of process planning and scheduling [J].
Phanden, Rakesh Kumar ;
Jain, Ajai ;
Verma, Rajiv .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2013, 26 (04) :284-302
[10]   Integration of process planning and scheduling: a state-of-the-art review [J].
Phanden, Rakesh Kumar ;
Jain, Ajai ;
Verma, Rajiv .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2011, 24 (06) :517-534