Data-driven robust strategies for joint optimization of rail renewal and maintenance planning

被引:15
作者
Mohammadi, Reza [1 ]
He, Qing [1 ,2 ]
Karwan, Mark [1 ]
机构
[1] SUNY Buffalo, Dept Ind & Syst Engn, Buffalo, NY 14260 USA
[2] Southwest Jiaotong Univ, MOE Key Lab High Speed Railway Engn, Chengdu 610031, Sichuan, Peoples R China
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2021年 / 103卷
关键词
Data-driven optimization; Robust optimization; Rail maintenance; Rail renewal; Uncertainty approximation; TRACK MAINTENANCE; BIG DATA; ALGORITHM; UNCERTAINTY; FRAMEWORK; GEOMETRY;
D O I
10.1016/j.omega.2020.102379
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We study the problem of rail renewal and maintenance planning. The problem is to determine when and what type of maintenance tasks or rail renewal are required to be performed on different segments to maintain the rail in a safe and reliable condition. This problem is formulated as a Mixed Integer Linear Programming (MILP) model. The model applies Track Quality Index and also defines a new index to represent the current condition of the rail. Maintenance recovery effect is intrinsically uncertain; therefore, we develop data-driven uncertainty set approximation approaches and leverage robust optimization to handle the uncertainty. Data-driven uncertainty sets are constructed by approximating convex hulls of uncertain data points and by adding cutting planes to mix of classic robust uncertainty sets. We also obtained the robust counterpart formulations of the proposed MILP model for constructed uncertainty sets. Furthermore, a heuristic algorithm is developed to facilitate solving large-scale instances. Applicability and efficiency of the proposed approach are demonstrated through an illustrative case study of a Class I freight railroad network in the United States. Our analyses reveal that the proposed approaches introduce efficient strategies to deal with uncertainties in rail networks at the reasonable cost of increasing the budget. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页数:20
相关论文
共 51 条
[1]  
AAR, 2018, OV AM FREIGHT RAILR
[2]  
Bakker H, 2019, OMEGA-J DEATH DYING
[3]   New heuristics for the Stochastic Tactical Railway Maintenance Problem [J].
Baldi, Mauro M. ;
Heinicke, Franziska ;
Simroth, Axel ;
Tadei, Roberto .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 63 :94-102
[4]   The Quickhull algorithm for convex hulls [J].
Barber, CB ;
Dobkin, DP ;
Huhdanpaa, H .
ACM TRANSACTIONS ON MATHEMATICAL SOFTWARE, 1996, 22 (04) :469-483
[5]   The price of robustness [J].
Bertsimas, D ;
Sim, M .
OPERATIONS RESEARCH, 2004, 52 (01) :35-53
[6]   Data-driven robust optimization [J].
Bertsimas, Dimitris ;
Gupta, Vishal ;
Kallus, Nathan .
MATHEMATICAL PROGRAMMING, 2018, 167 (02) :235-292
[7]  
Bona M.E., 2005, The effect of straightening and grinding of welds on track roughness
[8]   Scheduling preventive railway maintenance activities [J].
Budai, G. ;
Huisman, D. ;
Dekker, R. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (09) :1035-1044
[9]  
Budai-Balke G, 2009, OPERATIONS RES MODEL, V456
[10]   Optimisation model to schedule railway track renewal operations: a life-cycle cost approach [J].
Caetano, Luis Filipe ;
Teixeira, Paulo Fonseca .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2015, 11 (11) :1524-1536