A decision-making framework for managing maintenance spare parts

被引:94
作者
Cavalieri, S. [2 ]
Garetti, M. [1 ]
Macchi, M. [1 ]
Pinto, R. [1 ]
机构
[1] Politecn Milan, Dipartimento Ingn Gestionale, I-20133 Milan, Italy
[2] Univ Bergamo, Dipartimento Ingn Ind, Bergamo, Italy
关键词
spare parts management; maintenance management; plant maintenance; after sales logistical support; framework; decision support;
D O I
10.1080/09537280802034471
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Despite the huge body of academic literature on inventory management of maintenance spare parts, few companies seem to deliberately use the proper approaches and tools for a factual and quantitative assessment. Detaining or not stocks of a spare item, deciding upon the right level of inventory, forecasting its sporadic consumption are just some of the evidences of the complexity and criticality underlying the daily decisions the management of a company has to undertake. The objective of the paper is to provide a stepwise decision-making path in order to orienteer an industrial manager on how to pragmatically handle the management of maintenance spare parts in a company. The framework is structured into five sequential steps: part coding, part classification, part demand forecasting, stock management policy and policy test and validation. Its applicability is demonstrated by making use of a real business case where it has been successfully adopted.
引用
收藏
页码:379 / 396
页数:18
相关论文
共 58 条
[1]   An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system [J].
Al-Rifai, Mohammad H. ;
Rossetti, Manuel D. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 109 (1-2) :195-213
[2]  
[Anonymous], 1993, LOGISTICS PRODUCTION
[3]   Inventory management of repairable service parts for personal computers - A case study [J].
Ashayeri, J ;
Heuts, R ;
Jansen, A ;
Szczerba, B .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1996, 16 (12) :74-&
[4]   MRO inventory reduction - challenges and management: a case study of the Tennessee Valley Authority [J].
Bailey, G. J. ;
Helms, M. M. .
PRODUCTION PLANNING & CONTROL, 2007, 18 (03) :261-270
[5]   OPTIMAL PROVISIONING FOR SINGLE-ECHELON REPAIRABLE ITEM INVENTORY CONTROL IN A TIME-VARYING ENVIRONMENT [J].
BALANA, AR ;
GROSS, D ;
SOLAND, RM .
IIE TRANSACTIONS, 1989, 21 (03) :202-212
[6]  
Barringer H. P., 1996, P 5 INT C PROC PLANT, P1
[7]  
Birolini A., 2004, RELIABILITY ENG THEO, DOI 10.1007/978-3-662-05409-3
[8]   The accuracy of a Modified Croston procedure [J].
Boylan, J. E. ;
Syntetos, A. A. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (02) :511-517
[9]   Two-echelon spare parts inventory system subject to a service constraint [J].
Caglar, D ;
Li, CL ;
Simchi-Levi, D .
IIE TRANSACTIONS, 2004, 36 (07) :655-666
[10]  
CIRILLO L, 1999, THESIS POLITECNICO M