Scheduling of multi-product batch plants using reachability analysis of timed automata models

被引:0
|
作者
Subbiah, Subanatarajan [1 ]
Panek, Sebastian [1 ]
Engell, Sebastian [1 ]
Stursberg, Olaf [2 ]
机构
[1] Univ Dortmund, Proc Control Lab BCI AST, D-44221 Dortmund, Germany
[2] Tech Univ Munich, Ind Automat Syst EI LSR, Munich, Germany
来源
ICINCO 2007: PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL ICSO: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION | 2007年
关键词
scheduling; timed automata; reachability analysis; multi-product batch plant;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Standard scheduling approaches in process industries are often based on algebraic problem formulations solved as MI(N)LP optimization problems to derive production schedules. To handle such problems techniques based on timed automata have emerged recently. This contribution reports on a successful application of a new modeling scheme to formulate scheduling problems in process industries as timed automata (TA) models and describes the solution technique to obtain schedules using symbolic reachability analysis. First, the jobs, resources and additional constraints are modeled as sets of synchronized timed automata. Then, the individual automata are composed by parallel composition to form a global automaton which has an initial location where no jobs have been started and at least one target location where all jobs have been finished. A cost optimal symbolic reachability analysis is performed on the composed automaton to derive schedules. The main advantage of this approach over other MILP techniques is the intuitive graphical and modular modeling and the ability to compute better solutions within reasonable computation time. This is illustrated by a case study.
引用
收藏
页码:141 / +
页数:2
相关论文
共 50 条
  • [31] Modeling and Solving Batch Scheduling Problems with Various Storage Policies and Operational Policies using Timed Automata
    Schoppmeyer, Christian
    Subbiah, Subanatarajan
    Engell, Sebastian
    11TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, PTS A AND B, 2012, 31 : 635 - 639
  • [32] A Bi-level Decomposition Scheme for the Integration of Planning and Scheduling in Parallel Multi-Product Batch Reactors
    Erdirik-Dogan, Muge
    Grossmann, Ignacio E.
    Wassick, John
    17TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2007, 24 : 625 - 630
  • [33] Scheduling multi-product tree-structure pipelines
    MirHassani, S. A.
    Jahromi, H. Fani
    COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (01) : 165 - 176
  • [34] VERIFICATION OF A FIELDBUS SCHEDULING PROTOCOL USING TIMED AUTOMATA
    Petalidis, Nicholaos
    COMPUTING AND INFORMATICS, 2009, 28 (05) : 655 - 672
  • [35] Safety Analysis of Helicopter Models using Timed Automata Hybrid Systems
    Sutarto, H. Y.
    Megawati, N. Y.
    Salmah
    Suparwanto, A.
    Joelianto, E.
    Wijayanti, I. E.
    Budiyono, A.
    Solikhatun
    ICICI-BME: 2009 INTERNATIONAL CONFERENCE ON INSTRUMENTATION, COMMUNICATION, INFORMATION TECHNOLOGY, AND BIOMEDICAL ENGINEERING, 2009, : 430 - +
  • [36] Batch selection, assignment and sequencing in multi-stage multi-product processes
    Prasad, Pradeep
    Maravelias, Christos T.
    COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (06) : 1106 - 1119
  • [37] A CEGAR Tool for the Reachability Analysis of PLC-Controlled Plants Using Hybrid Automata
    Nellen, Johanna
    Abraham, Erika
    Wolters, Benedikt
    FORMALISMS FOR REUSE AND SYSTEMS INTEGRATION, 2015, 346 : 55 - 78
  • [38] A hybrid heuristic for the multi-product straight pipeline scheduling problem
    Bamoumen, M.
    Belil, S.
    Elfirdoussi, S.
    Ren, L.
    Tchernev, N.
    IFAC PAPERSONLINE, 2019, 52 (13): : 535 - 540
  • [39] Research on the problem of scheduling multi-product batches in the process industry
    Tang Qi
    Zhang Qing-shan
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 2702 - 2707
  • [40] Multi-product lot sizing and scheduling on unrelated parallel machines
    Dolgui, Alexandre
    Eremeev, Anton V.
    Kovalyov, Mikhail Y.
    Kuznetsov, Pavel M.
    IIE TRANSACTIONS, 2010, 42 (07) : 514 - 524