Unit Commitment using Embedded Systems

被引:0
作者
Jayabarathi, R. [1 ]
Jisma, M. [1 ]
Suyampulingam, A. [1 ]
机构
[1] Amrita Vishwa Vidyapeetham, Coimbatore 641112, Tamil Nadu, India
来源
SMART GRID TECHNOLOGIES (ICSGT- 2015) | 2015年 / 21卷
关键词
Embedded Development kit; Dynamic programming; Unit commitment;
D O I
10.1016/j.protcy.2015.10.015
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Unit commitment problem helps in deciding which electricity generation unit should be running in each period so as to satisfy a predictably varying demand for electricity. Unit Commitment enables uninterruptible power to be delivered to consumers using the principle of minimum operating cost. In this paper a laboratory prototype for unit commitment is developed using embedded systems. In this work, the unit commitment problem is solved using dynamic programming approach. The generators are switched ON and OFF on a priority basis to minimize the total operating cost of the generating units. An Embedded Development Kit(EDK) is used for the prototype which supports micro framework technology. The laboratory prototype is tested for various combinations of generating units. (C) 2015 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
引用
收藏
页码:96 / 102
页数:7
相关论文
共 12 条
[1]  
[Anonymous], 2003, Modern Power System Analysis
[2]  
[Anonymous], 2013, Power generation, operation, and control
[3]   A new method for unit commitment with ramping constraints [J].
Fan, W ;
Guan, XH ;
Zhai, QZ .
ELECTRIC POWER SYSTEMS RESEARCH, 2002, 62 (03) :215-224
[4]  
Jayabarathi R., 2007, AM J APPL SCI
[5]   Impact of demand response resources on unit commitment and dispatch in a day-ahead electricity market [J].
Magnago, F. H. ;
Alemany, J. ;
Lin, J. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 68 :142-149
[6]   A profit-based unit commitment CA for the competitive environment [J].
Richter, CW ;
Sheblé, GB .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (02) :715-721
[7]   Solution of unit commitment problem using quasi-oppositional teaching learning based algorithm [J].
Roy, Provas Kumar ;
Sarkar, Ranadhir .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2014, 60 :96-106
[8]  
Sen Subir, ELSEVEIR J ELECT POW, V20, P443
[9]  
Singhal, 2011, IEEE INT C COMM SYST
[10]  
Supriya P., 2011, IEEE PES SMART GRID