共 43 条
Optimized Parameters and Mechanisms for Simultaneous Nitrogen and Phosphorus Removal in Stormwater Biofilters: A Pilot Study
被引:3
作者:
Wan, Lingling
[1
,2
]
Cao, Lu
[3
]
Cao, Xiuyun
[1
]
Zhou, Yiyong
[1
]
Song, Chunlei
[1
]
机构:
[1] Chinese Acad Sci, Inst Hydrobiol, State Key Lab Freshwater Ecol & Biotechnol, Key Lab Algal Biol, 7 South Rd, Wuhan 430072, Hubei, Peoples R China
[2] Univ Chinese Acad Sci, Beijing, Peoples R China
[3] Nanjing Saite Environm Engn Co Ltd, Nanjing, Jiangsu, Peoples R China
基金:
中国国家自然科学基金;
关键词:
biofilter;
inflow C/N;
outflow water level;
plant detritus;
retention time;
CONSTRUCTED WETLAND;
POLLUTANT REMOVAL;
SEDIMENT REMOVAL;
NUTRIENT REMOVAL;
SUBMERGED ZONE;
RETENTION TIME;
DENITRIFICATION;
PERFORMANCE;
CARBON;
NITRATE;
D O I:
10.1089/ees.2018.0074
中图分类号:
X [环境科学、安全科学];
学科分类号:
08 ;
0830 ;
摘要:
Nitrogen (N) removal efficiency through denitrification is usually not ideal and stable in biofilter systems due to the deficiency of organic carbon supply and difficulty of formation of anaerobic status, which could be enhanced by regulating the inflow carbon/nitrogen ratio (C/N), outflow water level, retention time, and addition of plant detritus through the pilot-scale stormwater biofilter study. Removal efficiency of ammonium (NH4+-N), soluble reactive phosphorus (SRP), and total phosphorus (34-90%) was significantly higher than that of nitrate (NO3--N), dissolved total nitrogen (DTN), and total nitrogen (TN) (9-25%) in the biofilter systems. The addition of plant detritus (especially herbaceous plant) in biofilter systems can enhance the nitrogen (N) and phosphorus (P) removal efficiency by >24%. Through further regulation of inflow C/N, retention time, and outflow water level to promote denitrification, removal efficiency of NO3--N, DTN, and TN was significantly enhanced and reached up to 83%, 68%, and 73% on average, respectively. However, P leaching increased due to SRP release from iron-bound P caused by anoxia. In the overall consideration of N and P removal, optimized inflow C/N, retention time, and outflow water level are estimated as 10-30, 1-2 h, and 20-40 cm, respectively, which makes a crucial contribution to simultaneous N and P removal.
引用
收藏
页码:372 / 383
页数:12
相关论文