Time management in the cost evaluation of limited resource programs

被引:5
作者
Sánchez-Algarra, P
Anguera-Argilaga, M
机构
[1] Fac Biol, Dept Estadist, Barcelona 08028, Spain
[2] Fac Psicol, Dept Metodol Ciencias Comportamiento, Barcelona 08035, Spain
关键词
cost techniques; critical path; CPM; Gantt chart; PERT; time management;
D O I
10.1007/s11135-004-2979-4
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
Planning, implementing and evaluating an intervention program all hinge around time. A program's actions are planned according to a forecast of the time required to achieve certain objectives, and the program's implementation among a group of users is conditioned by its real time application. Similarly, program evaluation needs to take into consideration the time resource when analysing objectively the extent to which a program's targets have been reached, and when conducting a cost analysis of the program. In limited resource programs, any disparity between the scheduled time and the real time available can have serious consequences, and even undermine a program's efficacy. Time management, above all where resources are limited, is therefore the linchpin in the planning, implementation and evaluation of an intervention program. In this study we analyse the utility of PERT and CPM as basic tools for the efficient time management of limited resource programs.
引用
收藏
页码:391 / 411
页数:21
相关论文
共 12 条
[1]  
ALGARRA PS, 1993, ANAL PSICOLOGIA, V9, P213
[2]  
ANGUERAARGILAGA MT, IN PRESS EVALUACION
[3]  
[Anonymous], PSICOTHEMA
[4]  
CARRASCO J, 1986, MANUAL PLANIFICACION
[5]  
COLLANTES A, 1982, EI PERT
[6]  
COLMENAR A, 2000, GESTION PROYECTOS MI
[7]  
FERNANDEZBALLES.R, 1985, EVALUACION PSICOLOGI, V1, P5
[8]  
LISSARRAGUE J, 1971, QUESTCE QUE P E R T
[9]  
MARTINO RL, 1965, DETERMINACION RUTA C
[10]  
MODER JJ, 1964, PROJECT MANAGEMENT C