CHINESE POSTMAN PROBLEM APPROACH FOR A LARGE-SCALE CONVENTIONAL RAIL NETWORK IN TURKEY

被引:5
作者
Yilmaz, Mustafa [1 ]
Codur, Merve Kayaci [1 ]
Yilmaz, Hamid [2 ]
机构
[1] Univ Ataturk, Fac Ind Engn, TR-25070 Erzurum, Turkey
[2] Bayburt Univ, Ind Engn Dept, Dede Korkut Kampusu, TR-69000 Bayburt, Turkey
来源
TEHNICKI VJESNIK-TECHNICAL GAZETTE | 2017年 / 24卷 / 05期
关键词
arc routing; Chinese postman problem; railway inspection; ARC ROUTING-PROBLEMS; MAINTENANCE;
D O I
10.17559/TV-20151231153445
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Every year, railways are inspected periodically to examine the status of rail tracks and ensure the safety of train operations of the railroad networks in Turkey. These inspection projects must be performed by several specialized machines with large and expensive equipment. Finding the optimum route of inspection machines that control through travelling all lines is critically important in terms of cost and distance. In current practice, determining the route of these machines is largerly manual and primarily relies on the knowledge and judgment of experts. This paper proposes Chinese Postman Problem (CPP) to solve the inspection machine routing problem. The objective is to minimize the total travel distance on the railroads by finding the shortest route. The proposed model is applied to a large-scale real world problem. Compared to the current practice the proposed approach significantly outperforms the reduced objective value by 20,76%.
引用
收藏
页码:1471 / 1477
页数:7
相关论文
共 23 条
[1]  
[Anonymous], 2014, REPUBLIC TURKEY GEN
[2]  
Assad A., 1995, Handbooks in Operations Research Management Science, V8, P375, DOI 10.1016/S0927-0507(05)80109-4
[3]   Rail defects: an overview [J].
Cannon, DF ;
Edel, KO ;
Grassie, SL ;
Sawley, K .
FATIGUE & FRACTURE OF ENGINEERING MATERIALS & STRUCTURES, 2003, 26 (10) :865-886
[4]  
Corberan a, 2014, ARC ROUTING PROBLEMS
[5]  
Dror M., 2000, Arc routing : Theory, solutions and applications
[6]   ARC ROUTING-PROBLEMS .1. THE CHINESE POSTMAN PROBLEM [J].
EISELT, HA ;
GENDREAU, M ;
LAPORTE, G .
OPERATIONS RESEARCH, 1995, 43 (02) :231-242
[7]   A hierarchical line planning approach for a large-scale high speed rail network: The China case [J].
Fu, Huiling ;
Nie, Lei ;
Meng, Lingyun ;
Sperry, Benjamin R. ;
He, Zhenhuan .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2015, 75 :61-83
[8]   NEW GRAPHICAL APPROACH TO RAILWAY INFRASTRUCTURE CAPACITY ANALYSIS [J].
Gasparik, Jozef ;
Abramovic, Borna ;
Halas, Martin .
PROMET-TRAFFIC & TRANSPORTATION, 2015, 27 (04) :283-290
[9]  
Guan M., 1962, CHIN MATHEMATICS, V1, P237
[10]  
Hong S., 2009, ACM SIGARCH COMPUTER, V37, P3