Exploring Symmetry in a Short-Term Hydro Scheduling Problem: The Case of the Santo Antonio Hydro Plant

被引:8
作者
Brito, Brunno H. [1 ,2 ]
Finardi, Erlon C. [3 ,4 ]
Takigawa, Fabricio Y. K. [5 ]
Pereira, Airton, I [6 ]
Gosmann, Rodrigo P. [6 ]
Weiss, Leonardo A. [6 ]
Fernandes, Argemiro [7 ]
Morais, Douglas T. S. de Assis [7 ]
机构
[1] Fed Inst Tocantins, Articulated Teaching Nucleus Control & Ind Proc, BR-77020450 Palmas, Brazil
[2] Univ Fed Santa Catarina, Dept Elect Engn, BR-88040900 Florianopolis, SC, Brazil
[3] Univ Fed Santa Catarina, Dept Elect & Elect Engn, BR-88040900 Florianopolis, SC, Brazil
[4] Inst Engn Syst & Comp Res & Dev Brazil, BR-11055300 Santos, SP, Brazil
[5] Fed Inst Santa Catarina, Dept Elect Engn, BR-88020300 Florianopolis, SC, Brazil
[6] REIVAX Automat & Control, Dept Res & Amp Dev, BR-88030904 Florianopolis, SC, Brazil
[7] Santo Antonio Energia, Dept Plant Operat, BR-76820136 Porto Velho, Brazil
关键词
UNIT COMMITMENT PROBLEM; GENERATION; DISPATCH; SYSTEM; MODEL;
D O I
10.1061/(ASCE)WR.1943-5452.0001495
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Santo Antonio is the fifth largest hydro plant in Brazil. Due to the environmental constraints, the plant follows a run-of-river operation and, to handle inflow variability, possesses the 50 most oversized bulb generating units (GUs) in the world. These issues render a challenging short-term hydro scheduling problem (STHS), where the critical aspect is modeling the hydropower function (HPF). In this context, this article proposes a two-step strategy based on mixed-integer linear programming (MILP) to solve the STHS, that: (1) explores the symmetry related to the identical GUs by applying a binary expansion to find which units will be active, and (2) obtain the optimal load distribution by linearizing a series of nonlinear problems. In both steps, the HPF is linearized using the logarithmic aggregated convex combination (LACC) model. The symmetry exploration based on the binary expansion is new in the context of the STHS. The experiments show that the proposed strategy yields equal solutions to those obtained by an individual-LACC approach while providing, on average, a 74% reduction in computational time. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Research on short-term joint optimization scheduling strategy for hydro-wind-solar hybrid systems considering uncertainty in renewable energy generation
    Li, Fugang
    Chen, Shijun
    Ju, Chengqian
    Zhang, Xinshuo
    Ma, Guangwen
    Huang, Weibin
    ENERGY STRATEGY REVIEWS, 2023, 50
  • [42] A hybrid particle swarm optimization with small population size to solve the optimal short-term hydro-thermal unit commitment problem
    Zhang, Jingrui
    Tang, Qinghui
    Chen, Yalin
    Lin, Shuang
    ENERGY, 2016, 109 : 765 - 780
  • [43] Data-driven two-stage stochastic optimization model for short-term hydro-thermal-wind coordination scheduling based on the dynamic extreme scenario set
    Zhang, Yachao
    An, Xueli
    Wang, Chao
    SUSTAINABLE ENERGY GRIDS & NETWORKS, 2021, 27
  • [44] Recurrent neural network for solving the short-term hydrothermal scheduling problem
    Bao, Lei
    Shen, Yanjun
    Miao, Peng
    Li, Wenwu
    2015 IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION, 2015, : 2388 - 2393
  • [45] Short-term Scheduling of a Multipurpose Batch Plant Considering Degradation Effects
    Wu, Ouyang
    Ave, Giancarlo Dalle
    Harjunkoski, Iiro
    Imsland, Lars
    Schneider, Stefan Marco
    Bouaswaig, Ala E. F.
    Roth, Matthias
    29TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2019, 46 : 1213 - 1218
  • [46] Krill herd algorithm applied to short-term hydrothermal scheduling problem
    Roy, Provas Kumar
    Pradhan, Moumita
    Paul, Tandra
    AIN SHAMS ENGINEERING JOURNAL, 2018, 9 (01) : 31 - 43
  • [47] Self-Scheduling Short-Term Unit Commitment and Loading Problem
    Seguin, Sara
    Cote, Pascal
    Audet, Charles
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (01) : 133 - 142
  • [48] Short-term stochastic multi-objective optimization scheduling of wind-solar-hydro hybrid system considering source-load uncertainties
    Fan, Yukun
    Liu, Weifeng
    Zhu, Feilin
    Wang, Sen
    Yue, Hao
    Zeng, Yurou
    Xu, Bin
    Zhong, Ping-an
    APPLIED ENERGY, 2024, 372
  • [49] Solving the Short-Term Scheduling Problem of Hydrothermal Systems via Lagrangian Relaxation and Augmented Lagrangian
    Rodrigues, Rafael N.
    da Silva, Edson L.
    Finardi, Erlon C.
    Takigawa, Fabricio Y. K.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2012, 2012
  • [50] An adaptive chaotic differential evolution for the short-term hydrothermal generation scheduling problem
    Lu, Youlin
    Zhou, Jianzhong
    Qin, Hui
    Wang, Ying
    Zhang, Yongchuan
    ENERGY CONVERSION AND MANAGEMENT, 2010, 51 (07) : 1481 - 1490