Exploring Symmetry in a Short-Term Hydro Scheduling Problem: The Case of the Santo Antonio Hydro Plant

被引:8
作者
Brito, Brunno H. [1 ,2 ]
Finardi, Erlon C. [3 ,4 ]
Takigawa, Fabricio Y. K. [5 ]
Pereira, Airton, I [6 ]
Gosmann, Rodrigo P. [6 ]
Weiss, Leonardo A. [6 ]
Fernandes, Argemiro [7 ]
Morais, Douglas T. S. de Assis [7 ]
机构
[1] Fed Inst Tocantins, Articulated Teaching Nucleus Control & Ind Proc, BR-77020450 Palmas, Brazil
[2] Univ Fed Santa Catarina, Dept Elect Engn, BR-88040900 Florianopolis, SC, Brazil
[3] Univ Fed Santa Catarina, Dept Elect & Elect Engn, BR-88040900 Florianopolis, SC, Brazil
[4] Inst Engn Syst & Comp Res & Dev Brazil, BR-11055300 Santos, SP, Brazil
[5] Fed Inst Santa Catarina, Dept Elect Engn, BR-88020300 Florianopolis, SC, Brazil
[6] REIVAX Automat & Control, Dept Res & Amp Dev, BR-88030904 Florianopolis, SC, Brazil
[7] Santo Antonio Energia, Dept Plant Operat, BR-76820136 Porto Velho, Brazil
关键词
UNIT COMMITMENT PROBLEM; GENERATION; DISPATCH; SYSTEM; MODEL;
D O I
10.1061/(ASCE)WR.1943-5452.0001495
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Santo Antonio is the fifth largest hydro plant in Brazil. Due to the environmental constraints, the plant follows a run-of-river operation and, to handle inflow variability, possesses the 50 most oversized bulb generating units (GUs) in the world. These issues render a challenging short-term hydro scheduling problem (STHS), where the critical aspect is modeling the hydropower function (HPF). In this context, this article proposes a two-step strategy based on mixed-integer linear programming (MILP) to solve the STHS, that: (1) explores the symmetry related to the identical GUs by applying a binary expansion to find which units will be active, and (2) obtain the optimal load distribution by linearizing a series of nonlinear problems. In both steps, the HPF is linearized using the logarithmic aggregated convex combination (LACC) model. The symmetry exploration based on the binary expansion is new in the context of the STHS. The experiments show that the proposed strategy yields equal solutions to those obtained by an individual-LACC approach while providing, on average, a 74% reduction in computational time. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Dynamic incorporation of nonlinearity into MILP formulation for short-term hydro scheduling
    Skjelbred, Hans Ivar
    Kong, Jiehong
    Fosso, Olav Bjarte
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2020, 116
  • [2] An overview on formulations and optimization methods for the unit-based short-term hydro scheduling problem
    Kong, Jiehong
    Skjelbred, Hans Ivar
    Fosso, Olav Bjarte
    ELECTRIC POWER SYSTEMS RESEARCH, 2020, 178 (178)
  • [3] A Review of Short-Term Hydro Scheduling Tools
    Osorio, G. J.
    Matias, J. C. O.
    Catalao, J. P. S.
    2013 48TH INTERNATIONAL UNIVERSITIES' POWER ENGINEERING CONFERENCE (UPEC), 2013,
  • [4] Mixed-Integer Nonlinear Programming Approach for Short-Term Hydro Scheduling
    Catalao, J. P. S.
    Pousinho, H. M. I.
    Mendes, V. M. F.
    IEEE LATIN AMERICA TRANSACTIONS, 2010, 8 (06) : 658 - 663
  • [5] MILP Based Robust Short-Term Scheduling for Wind-Thermal-Hydro Power System With Pumped Hydro Energy Storage
    Xia, Pei
    Deng, Changhong
    Chen, Yahong
    Yao, Weiwei
    IEEE ACCESS, 2019, 7 : 30261 - 30275
  • [6] Short-term hydro scheduling of a variable speed pumped storage hydropower plant considering head loss in a shared penstock
    Kong, J.
    Skjelbred, H. I.
    Abgottspon, H.
    29TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS, 2019, 240
  • [7] Domain Partition of the Hydro Production Function for Solving Efficiently the Short-Term Generation Scheduling Problem
    Brito, Brunno H.
    Finardi, Erlon C.
    Takigawa, Fabricio Y. K.
    Nogueira, Pierry L. R.
    Morais, Douglas T. S. A.
    Fernandes, Argemiro
    IEEE ACCESS, 2021, 9 : 152780 - 152791
  • [8] Fast Near-Optimal Heuristic for the Short-Term Hydro-Generation Planning Problem
    Marchand, Alexia
    Gendreau, Michel
    Blais, Marko
    Emiel, Gregory
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (01) : 227 - 235
  • [9] Multiobjective Scheduling Method for Short-Term Peak Shaving Operation of Cascade Hydro Plants
    Zhou, Lingan
    Cheng, Chuntian
    Liao, Shengli
    Wang, Jian
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2020, 146 (09)
  • [10] Algorithmic Development and Industrial Applications of Short-term Hydro Scheduling in the Nordic Power Market
    Skjelbred, Hans Ivar
    Kong, Jiehong
    Aasgard, Ellen Krohn
    Belsnes, Michael Martin
    Fosso, Olav Bjarte
    2022 IEEE PES 14TH ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE, APPEEC, 2022,