A fuzzy robust scheduling approach for product development projects

被引:87
作者
Wang, J [1 ]
机构
[1] Feng Chia Univ, Dept Ind Engn, Taichung 40724, Taiwan
关键词
project scheduling; fuzzy sets; research and development; possibility theory; genetic algorithms;
D O I
10.1016/S0377-2217(02)00701-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Efficient scheduling of a product development project is difficult, since a development project is usually unique in nature and high level of design imprecision exists at the early stages of product development. Moreover, risk-averse project managers are often more interested in estimating the risk of a schedule being late over all potential realizations. The objective of this research is to develop a robust scheduling methodology based on fuzzy set theory for uncertain product development projects. The imprecise temporal parameters involved in the project are represented by fuzzy sets. A measure of schedule robustness based on qualitative possibility theory is proposed to guide the search process to determine the robust schedule; i.e., the schedule with the best worst-case performance. A genetic algorithm approach is developed for solving the problem with acceptable performance. An example of electronic product development project is used to illustrate the concept developed. (C) 2002 Elsevier B.V. All rights reserved.
引用
收藏
页码:180 / 194
页数:15
相关论文
共 39 条
[1]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[2]  
[Anonymous], 1988, POSSIBILITY THEORY
[3]  
[Anonymous], 1993, DECISION THEORY INTR
[4]  
[Anonymous], 1992, LECT NOTES ECON M, DOI DOI 10.1007/978-3-642-46768-4_5
[5]  
BELL CE, 1990, NAV RES LOG, V37, P61, DOI 10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO
[6]  
2-S
[7]  
CHANAS S, 1987, OPTIMIZATION MODELS, P303
[8]   An evolution programme for the resource-constrained project scheduling problem [J].
Cheng, RW ;
Gen, M .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) :274-287
[9]   ROBUST SCHEDULING TO HEDGE AGAINST PROCESSING TIME UNCERTAINTY IN SINGLE-STAGE PRODUCTION [J].
DANIELS, RL ;
KOUVELIS, P .
MANAGEMENT SCIENCE, 1995, 41 (02) :363-376
[10]   A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J].
DEMEULEMEESTER, E ;
HERROELEN, W .
MANAGEMENT SCIENCE, 1992, 38 (12) :1803-1818