Reinstatement of preststressed concrete bridges - problems in the construction phase

被引:0
|
作者
Knaute, W. [1 ]
Franze, H. [2 ]
Mielke, F. [3 ]
机构
[1] SAXOTEST Ing GmbH Dresden, D-01217 Dresden, Germany
[2] Ingenieurburo Franze & Klose Bannewitz, D-01728 Bannewitz, Germany
[3] Strassenbauamt Meissen Dresden, D-01662 Meissen, Germany
来源
BAUINGENIEUR | 2011年 / 86卷
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
During the reinstatement of two 30 year old prestressed concrete bridges a great range of problems occurred. These problems required a rapid clarification to be able to continue the project under the complicated boundary conditions. This concerned among others immediate material analyses and development of solutions to the topics sealing/crystallizations with possible expansive reactions or endangered concrete composition and cracks as well as in particular bearings, concrete damages to end transversal girders and bridge seats. A further main focus was the repair of tendons because there were detected defects at the end anchorage. The necessary investigations together with the solutions of the problems are illustrated.
引用
收藏
页码:17 / 25
页数:9
相关论文
共 50 条
  • [1] REINSTATEMENT OF CONCRETE CONSTRUCTION AFTER A FIRE
    不详
    CONCRETE, 1971, 5 (04): : 115 - &
  • [2] CONCRETE CONSTRUCTION IN NEW MAJOR BRIDGES
    不详
    CONCRETE, 1967, 1 (02): : 51 - &
  • [3] DEVELOPMMENTS IN CONSTRUCTION OF CONCRETE RAILWAY BRIDGES
    MANN, FAW
    CONCRETE, 1968, 2 (09): : 373 - &
  • [4] CONSTRUCTION OPTIONS IN BIDDING CONCRETE BRIDGES
    SUTTER, JJ
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1980, 25 (04): : 59 - 65
  • [5] CONSTRUCTION TECHNIQUES FOR SEGMENTAL CONCRETE BRIDGES
    BARKER, JM
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1980, 25 (04): : 66 - 86
  • [6] Transfer matrix method for construction phase analysis of incrementally launched prestressed concrete bridges
    Sasmal, Saptarshi
    Ramanjaneyulu, K.
    ENGINEERING STRUCTURES, 2006, 28 (13) : 1897 - 1910
  • [7] Response of curved composite concrete deck-steel cellular bridges at construction phase
    Sennah, KM
    Kennedy, JB
    CANADIAN SOCIETY FOR CIVIL ENGINEERING, VOL I, PROCEEDINGS, 1999, : 175 - 184
  • [8] Innovative and sustainable replacement construction of concrete bridges
    Wirker, Andreas
    Donner, Ralf
    Flederer, Holger
    Boesche, Thomas
    BAUTECHNIK, 2021, 98 (07) : 482 - 491
  • [9] Construction Control of Reinforced Concrete Arch Bridges
    Au, F. T. K.
    Wang, J. J.
    Liu, G. D.
    JOURNAL OF BRIDGE ENGINEERING, 2003, 8 (01) : 39 - 45
  • [10] CONSTRUCTION TECHNIQUES FOR SEGMENTAL CONCRETE BRIDGES - REPLY
    BARKER, JM
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1981, 26 (03): : 134 - 134