Ormen lange pipelines - The design process

被引:0
作者
Marthinsen, Tom
Halvorsen, Vidar Henrik
Paulsen, Gunnar
机构
来源
PROCEEDINGS OF THE 26TH INTERNATIONAL CONFERENCE ON OFFSHORE MECHANICS AND ARCTIC ENGINEERING, VOL 3 | 2007年
关键词
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The paper presents an overview of the Ormen Lange pipeline engineering process from the early design studies until the presently ongoing activities of preparing for operation. In particular, ways of handling the following topics that presented unusual challenges are addressed: Pipeline routing and installation engineering Landfall design Free span design Seabed preparation techniques and tools Optimal combination of dredging and subsea rock installation Pipeline installation with tight laying tolerances Expansion design on extremely uneven seabed with soft soil conditions Loads from heavy trawl gear.
引用
收藏
页码:203 / 20809
相关论文
共 10 条
  • [1] *DNV, 1997, 13 DNV GUID
  • [2] *DNV, 1996, 14 DNV GUID
  • [3] EKLUND T, 2007, 18967 OTC
  • [4] *HOTPIPE, 2001, 20010142 STRUCT DES
  • [5] ILSTAD T, 2005, OMAE20567540
  • [6] *ISO, 2004, 155892 ISO
  • [7] KNAGENHJELM HO, 2006, OMAE200692152
  • [8] *OFFSH STAND SUBM, 2000, DNVOSF101
  • [9] PAULSEN G, 2000, ISOPE2000HM05
  • [10] 2002, PONDUS US MAN SINTEF