Complex Projects and Transition-Driven Evaluation: The Case of the easyRights European Project

被引:5
|
作者
Concilio, Grazia [1 ]
Karimi, Maryam [1 ]
Roessl, Lydia [2 ]
机构
[1] Politecn Milan, Dept Architecture & Urban Studies, I-20133 Milan, Italy
[2] Danube Univ Krems, Dept Migrat & Globalizat, A-3500 Krems, Austria
关键词
co-design approach; co-creation knowledge; learning dialogues; project evaluation; Quadruple Helix ecosystem; LEARNING-PROCESS; TOP-DOWN; INNOVATION; SUSTAINABILITY; FRAMEWORK; FUTURE; MARKET; IDENTIFICATION; GOVERNANCE; INDICATORS;
D O I
10.3390/su13042343
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
More and more, the evaluation of complex projects is being related to the capacity of the project to deal with crucial social, economic, and environmental issues that society is responsible for and with the activation of systemic changes. Within this "mission" perspective, growing attention is given to learning in action. This paper aims at (i) conceptualizing a methodological framework for complex project evaluation within the context of the Triple-Loop Learning mechanism and (ii) showing its application in a European project as well as including the toolbox developed in coherence with the elaborated framework. It does so by looking at the case of an ongoing Horizon 2020 project aiming to develop language-oriented technologies supporting the inclusion of migrants in Europe. In particular, the paper looks at Triple-Loop Learning as pushed by the reflection on three dimensions: the "what", the "how", and the "why" of collective actions in complex projects. The consequent learning process is expected to have transformational potentials at the individual, institutional/organizational, and (in the long term) up to the societal scale. By exploring the opportunities offered by the evaluation tools in the easyRights project, the study highlights the potential of nurturing a wider, arguably neglected as yet, learning space for understanding, engaging, and transforming real contexts and thus developing more effective contribution to the needed transition.
引用
收藏
页码:1 / 30
页数:30
相关论文
共 42 条
  • [1] Systemic Impact Evaluation: A Methodology for Complex Agricultural Development Projects. The Case of a Contract Farming Project in Guinea
    Jocelyne Delarue
    Hubert Cochet
    The European Journal of Development Research, 2013, 25 : 778 - 796
  • [2] Systemic Impact Evaluation: A Methodology for Complex Agricultural Development Projects. The Case of a Contract Farming Project in Guinea
    Delarue, Jocelyne
    Cochet, Hubert
    EUROPEAN JOURNAL OF DEVELOPMENT RESEARCH, 2013, 25 (05): : 778 - 796
  • [3] A Method for the Evaluation of Project Management Efficiency in the Case of Industrial Projects Execution
    Bouras, Vassilis K.
    SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 285 - 294
  • [4] Risk Evaluation in Project Management Implementation: The Case of Infrastructural Development Projects
    Dludhlu, N. I.
    Pretorius, J. H. C.
    van Wyngaard, C. J.
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1743 - 1747
  • [5] International Projects as a New Way to Solve Global Problems, Case Study of a European Project
    Fombona, Javier
    Angeles Pascual, Maria
    Listopadzka, Ewa
    SUSTAINABILITY, 2022, 14 (17)
  • [6] The Socio-Economic Evaluation of a European Project: The DIYLab Case
    Sancho-Gil, Juana M.
    Rivera-Vargas, Pablo J.
    INFORMATICS-BASEL, 2016, 3 (03):
  • [7] Evaluation of cacao projects in Colombia: The case of the rural Productive Partnerships Project (PAAP)
    Gil, Alejandro
    Brennan, Mark
    Chaudhary, Anil Kumar
    Maximova, Siela N.
    EVALUATION AND PROGRAM PLANNING, 2023, 97
  • [8] An externality evaluation model for hydropower projects: A case study of the Three Gorges Project
    Zheng, Tengfei
    Qiang, Maoshan
    Chen, Wenchao
    Xia, Bingqing
    Wang, Jianing
    ENERGY, 2016, 108 : 74 - 85
  • [9] Achieving ambidexterity in large, complex engineering projects: a case study of the Sutong Bridge project
    Liu, Li
    Wang, Xuerong
    Sheng, Zhaohan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2012, 30 (05) : 399 - 409
  • [10] Real option evaluation of complex infrastructure projects: The case of Dabhol Power
    Cheah, Charles
    Liu, Jicai
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2005, 10 (01) : 55 - +