Estimating the participation value of electricity demand-response programmes for a two-stage production system

被引:7
作者
Zhang, Yunrong [1 ,2 ]
Glock, Christoph H. [2 ]
Chen, Zhixiang [3 ]
机构
[1] Lanzhou Univ, Sch Management, Lanzhou, Peoples R China
[2] Tech Univ Darmstadt, Inst Prod & Supply Chain Management, Hochschulstr 1, D-64289 Darmstadt, Germany
[3] Sun Yat Sen Univ, Sun Yat Sen Business Sch, Guangzhou, Peoples R China
基金
中国国家自然科学基金;
关键词
Incentive-based programme; time-of-use pricing scheme; uncertainty; two-stage production system; production planning; INDUSTRIAL ENERGY EFFICIENCY; INVENTORY CONTROL; BATCH PROCESS; OPTIMIZATION; CONSUMPTION; REDUCTION; ALGORITHM;
D O I
10.1080/00207543.2021.1992681
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Electricity demand-response programmes, such as the incentive-based and price-based programmes, have been used by utilities to induce customers to reduce their electricity consumption during peak periods. This study investigates the production decisions of a two-stage production system under these programmes in a situation where peak periods arrive randomly in the manufacturing cycle. Analytical results show that under demand-response programmes, the manufacturer, who aims at minimising the total operational cost, usually selects a lower production rate during peak periods and a higher one during non-peak periods. Notably, the uncertainty of the peak periods also has a significant influence on the manufacturer's production plans under these programmes. This paper further investigates the efficiency of different demand-response programmes in reducing the inventory holding cost and electricity cost. The results indicate that participating in the demand-response programmes does not always result in a higher inventory holding cost, which goes against the manufacturer's intuition about these programmes. In addition, this paper evaluates the manufacturers' preference for these demand-response programmes by comparing the operational cost savings generated from participating in the two programmes. It turns out that both the demand-response signals and the inventory holding cost substantially influence the manufacturer's willingness to participate in the programmes.
引用
收藏
页码:6508 / 6528
页数:21
相关论文
共 55 条
[1]   Finding and Implementing Energy Efficiency Projects in Industrial Facilities [J].
Aflaki, Sam ;
Kleindorfer, Paul R. ;
de Miera Polvorinos, Victor Saenz .
PRODUCTION AND OPERATIONS MANAGEMENT, 2013, 22 (03) :503-517
[2]  
Albadi AH, 2007, IEEE POWER ENG SOC, P1665
[3]   A summary of demand response in electricity markets [J].
Albadi, M. H. ;
El-Saadany, E. F. .
ELECTRIC POWER SYSTEMS RESEARCH, 2008, 78 (11) :1989-1996
[4]  
[Anonymous], 2015, [No title captured]
[5]   Production and inventory control of a single product assemble-to-order system with multiple customer classes [J].
Benjaafar, Saif ;
ElHafsi, Mohsen .
MANAGEMENT SCIENCE, 2006, 52 (12) :1896-1912
[6]   Systematic literature review of decision support models for energy efficient production planning [J].
Biel, Konstantin ;
Glock, Christoph H. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 101 :243-259
[7]   On the use of waste heat in a two-stage production system with controllable production rates [J].
Biel, Konstantin ;
Glock, Christoph H. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 181 :174-190
[8]   Integrating energy efficiency performance in production management - gap analysis between industrial needs and scientific literature [J].
Bunse, Katharina ;
Vodicka, Matthias ;
Schoensleben, Paul ;
Bruelhart, Marc ;
Ernst, Frank O. .
JOURNAL OF CLEANER PRODUCTION, 2011, 19 (6-7) :667-679
[9]   Demand response in US electricity markets: Empirical evidence [J].
Cappers, Peter ;
Goldman, Charles ;
Kathan, David .
ENERGY, 2010, 35 (04) :1526-1535
[10]  
Ceryan O, 2012, IIE TRANS, V44, P386, DOI [10.1080/0740817x.2011.609525, 10.1080/0740817X.2011.609525]