Using extended Monte Carlo simulation method for the improvement of risk management: Consideration of relationships between uncertainties

被引:69
作者
Rezaie, K.
Amalnik, M. S.
Gereie, A.
Ostadi, B.
Shakhseniaee, M.
机构
[1] Univ Tehran, Fac Engn, Dept Ind Engn, Tehran, Iran
[2] Tarbiat Modares Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
关键词
risk management; Monte Carlo; simulation; uncertainty; interdependency;
D O I
10.1016/j.amc.2007.02.038
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
This paper considers the relationship of the major uncertainties of a project by using proposed approach. This approach by using rotary algorithm intellectualized the classic Monte Carlo simulation. This will help utility function to come closer to reality so that decision making and risk analysis would be done based on the real and possible modes, providing better conditions for decision making. Analyzing and investigating uncertainties are done in the risk management frame work. Because opportunities and threats are not separated, Monte Carlo simulation analysis is implemented as an integrated tool to reach the project goals, analyzing and investigating a variety of uncertainty permutations simultaneously. This method is a powerful tool for investigating the effects of all uncertainties' occurrence, so it has noticeable benefits such as simultaneous consideration of uncertainties and the capability of representing several dimensions of utility function. In spite of these benefits, not considering the type and level of relationships, some permutations of uncertainties will occur that are not possible in real world. This would divert the utility function from reality. A simple example is used to illustrate the application of the model in practice. (C) 2007 Elsevier Inc. All rights reserved.
引用
收藏
页码:1492 / 1501
页数:10
相关论文
共 10 条
  • [1] HAYSE JW, 2000, USING M CARLO ANAL E
  • [2] HILLSON D, 1999, FAITH BUSINESS Q, V3, P8
  • [3] HILLSON D, 2005, MURRAY WEBSTER UNDER
  • [4] Hillson DA, 2004, PROCEEDING PMI GLOBA
  • [5] LYONS T, 2002, THESIS QUEENSLAND U
  • [6] RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS
    PERRY, JG
    HAYES, RW
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1985, 78 (JUN): : 499 - 521
  • [7] POULTER SR, 1998, M CARLO SIMULATION E
  • [8] ROYER PS, 2000, RISK MANAGEMENT UNDI, V14, P31
  • [9] Applications to risk theory of a Monte Carlo multiple integration method
    Usábel, MA
    [J]. INSURANCE MATHEMATICS & ECONOMICS, 1998, 23 (01) : 71 - 83
  • [10] WOOD GD, 2003, MANAGEMENT, V10, P254