Integrated optimisation of stope boundary and access layout for underground mining operations

被引:14
作者
Hou, Jie [1 ]
Xu, Chaoshui [2 ,3 ]
Dowd, Peter Alan [2 ]
Li, Guoqing [1 ]
机构
[1] Univ Sci & Technol, Sch Civil & Resource Engn, Beijing, Peoples R China
[2] Univ Adelaide, Sch Civil Environm & Min Engn, Adelaide, SA, Australia
[3] Wuhan Univ Sci & Technol, Sch Resource & Environm Engn, Wuhan, Hubei, Peoples R China
关键词
Underground mine optimisation; optimal stope layout and access development; mixed integer nonlinear programming; dynamic access development cost model; OPEN-PIT OPTIMIZATION; MINE DESIGN;
D O I
10.1080/25726668.2019.1603920
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
For underground mines, two major designs that need to be optimised are the stope boundary and the access layout. The optimisation of these two components cannot be done independently as ore extracted from stopes is transported to the surface via the access network. Different stope locations result in different associated access development costs. This paper describes a proposed integrated optimisation model to optimise stope and access layouts simultaneously. The interactions and interdependency between stopes and access are ensured by a dynamic access development cost analysis based on recursive computations. Mixed integer non-linear programming is used to maximise the overall economic value subject to the constraints of generating optimal stopes and access layout, which is solved by a Genetic Algorithm modified for computational efficiency. A stratiform gold deposit is used as a case study to demonstrate that the new approach can provide a more profitable solution compared with traditional approaches.
引用
收藏
页码:193 / 205
页数:13
相关论文
共 33 条
[1]  
Alford C, 2009, P PROJ EV C MELB
[2]  
Alford C.G., 1986, AUSIMM IE AUST NEWM
[3]  
Alford C, 2007, INT SER OPER RES MAN, V99, P561, DOI 10.1007/978-0-387-71815-6_30
[4]  
[Anonymous], 2014, GUROBI OPTIMIZER REF
[5]   Optimisation of stope limits using a heuristic approach [J].
Ataee-pour, M .
TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2004, 113 (02) :A123-A128
[6]  
Bai X, 2014, J S AFR I MIN METALL, V114, P427
[7]   Underground stope optimization with network flow method [J].
Bai, Xiaoyu ;
Marcotte, Denis ;
Simon, Richard .
COMPUTERS & GEOSCIENCES, 2013, 52 :361-371
[8]  
Bootsma M., 2013, CUT OFF GRADE BASED
[9]   Optimising declines in underground mines [J].
Brazil, M ;
Lee, DH ;
Van Leuven, M ;
Rubinstein, JH ;
Thomas, DA ;
Wormald, NC .
TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2003, 112 :164-170
[10]   Network optimization for the design of underground mines [J].
Brazil, M. ;
Thomas, D. A. .
NETWORKS, 2007, 49 (01) :40-50