Pressures on the lining of a large shield tunnel with a small overburden: A case study

被引:60
作者
Han, Lei [1 ,2 ]
Ye, Guan-lin [1 ,2 ]
Chen, Jin-jian [1 ,2 ]
Xia, Xiao-he [1 ,2 ]
Wang, Jian-hua [1 ,2 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Civil Engn, Shanghai 200240, Peoples R China
[2] Shanghai Jiao Tong Univ, State Key Lab Ocean Engn, Shanghai 200240, Peoples R China
关键词
In-situ monitoring; Earth pressure; Tail brush; Backfill grouting; Segment damage; THEORETICAL-MODEL; BEHAVIOR; CONSTRUCTION; EXCAVATION; SEGMENTS; STAGE; RIVER;
D O I
10.1016/j.tust.2017.01.008
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The pressure on a tunnel lining is an important issue in shield tunnel design, because it is related to the safety and durability of the lining. There is an increasing need for short (about 1 km) but wide traffic tunnels in parts of China near rivers. In order to satisfy the gradient requirement of the road over such a short distance, the depth of the overburden is inevitably very shallow. The non-uniform distribution of the pressure on the lining of this kind of tunnel may result in damage to the tunnel segments. However, little published research is available on this topic. In this study, in-situ monitoring was carried out to measure the pressure on the lining of a large cross-river shield tunnel (diameter D 11.36 m) with a shallow overburden (0.7 D) in silty-sandy ground. A pad type earth pressure gauges and pore-water pressure gauges were used to measure the pressures on the tunnel lining, including the tail brush pressure, grouting pressure, earth pressure and pore-water pressure. The time history and the distribution of pressures on the lining during tunnel construction and post-construction were obtained. A comparison between the measured values and theoretical values was carried out. This showed that the tail brush pressure had a considerable effect on the segments while the shield machine was passing through. Non-uniform tail brush pressures caused cracking and water leakage in the concrete segments. The maximum pressure induced by the backfill grouting was twice that of the theoretical earth pressure. However, the non-uniformity of the backfill grouting induced pressure was not as great as that induced by the tail brushes. In the silty sandy ground, the earth pressures were generally stable 24 h after segment assembly. The final stable values were close to the total overburden pressure, particularly at the tunnel crown. The pore-water pressure generally was equal to the hydrostatic pressure and accounts for a large proportion of the total earth pressure. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1 / 9
页数:9
相关论文
共 34 条
[1]  
[Anonymous], 2000, TUNN UNDERGR SPACE T
[2]   STABILITY OF A SHALLOW CIRCULAR TUNNEL IN COHESIONLESS SOIL [J].
ATKINSON, JH ;
POTTS, DM .
GEOTECHNIQUE, 1977, 27 (02) :203-215
[3]  
Bakker K. J., 2008, GEOTECHNICAL ASPECTS
[4]   Field measurements of grout pressures during tunnelling of the Sophia Rail Tunnel [J].
Bezuijen, A ;
Talmon, AM ;
Kaalberg, FJ ;
Plugge, R .
SOILS AND FOUNDATIONS, 2004, 44 (01) :39-48
[5]   Internal Forces Arising in the Segmental Lining of an Earth Pressure Balance-Bored Tunnel [J].
Bilotta, Emilio ;
Russo, Gianpiero .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2013, 139 (10) :1765-1780
[6]   Numerical study on crack problems in segments of shield tunnel using finite element method [J].
Chen, J. S. ;
Mo, H. H. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2009, 24 (01) :91-102
[7]   Mechanical behavior of segment rebar of shield tunnel in construction stage [J].
Chen, Jun-sheng ;
Mo, Hai-hong .
JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2008, 9 (07) :888-899
[8]   In situ monitoring of frost heave pressure during cross passage construction using ground-freezing method [J].
Han, Lei ;
Ye, Guan-lin ;
Li, Yuan-hai ;
Xia, Xiao-he ;
Wang, Jian-hua .
CANADIAN GEOTECHNICAL JOURNAL, 2016, 53 (03) :530-539
[9]  
Hashimoto T., 1993, P 28 ANN REP JGS, P2055
[10]  
Hashimoto T., 2005, TUNN DECADE PROG GEO, V101