A production planning in highly automated manufacturing system considering multiple process plans with different energy requirements

被引:30
作者
Choi, Yong-Chan [1 ]
Xirouchakis, Paul [1 ]
机构
[1] Swiss Fed Technol Lausanne EPFL, Inst Engn Mech, STI IGM LICP, CH-1015 Lausanne, Switzerland
关键词
Production planning; Flexible manufacturing system; Minimum energy consumption; Multiple process plans; CONSUMPTION; MODELS;
D O I
10.1007/s00170-013-5306-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper focuses on a production planning problem in a highly automated manufacturing system considering multiple process plans with different energy requirements. The system consists of several closely interconnected sub-systems such as the processing system, the material (part) handling system, the tool transport system and the auxiliary system responsible for a supply of cooling/lubricants and a waste disposal. We propose a methodology for an estimation of energy consumption and material flows that are incurred at a system level with respect to multiple process plans for a part type. In addition, this study focuses on a production planning problem with the objective to minimize the weighted sum of energy consumption, inventory holding cost and backorder cost on a FMS considering multiple process plans. The production planning model is developed as a linear programming model. The benefit coming from the adoption of suggested model has been addressed with reference to a real industrial use case study.
引用
收藏
页码:853 / 867
页数:15
相关论文
共 29 条
[1]   A hierarchical approach to FMS planning and control with simulation-based capacity anticipation [J].
Albey, Erinc ;
Bilge, Umit .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (11) :3319-3342
[2]   A multi-criteria decision method for sustainability assessment of the use phase of machine tool systems [J].
Avram, Oliver ;
Stroud, Ian ;
Xirouchakis, Paul .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (5-8) :811-828
[3]   Evaluating the use phase energy requirements of a machine tool system [J].
Avram, Oliver Ioan ;
Xirouchakis, Paul .
JOURNAL OF CLEANER PRODUCTION, 2011, 19 (6-7) :699-711
[4]   Hierarchical Production Planning for Semiconductor Wafer Fabrication Based on Linear Programming and Discrete-Event Simulation [J].
Bang, June-Young ;
Kim, Yeong-Dae .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2010, 7 (02) :326-336
[5]  
Bettoni L., 2012, ADV PRODUCTION MANAG, V384, P9
[6]   Production planning: An improved hybrid approach [J].
Byrne, MD ;
Hossain, MM .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 93-4 :225-229
[7]  
Cannata A, 2010, ZONING
[8]  
Copani G., 2012, LEVERAGING TECHNOLOG, P209, DOI [10.1007/978-3-642-29069-5_36, DOI 10.1007/978-3-642-29069-5_]
[9]  
Dahmus JB, 2004, P IMECE 2004 NOV AN
[10]   A priority scheduling approach for flexible job shops with multiple process plans [J].
Doh, Hyoung-Ho ;
Yu, Jae-Min ;
Kim, Ji-Su ;
Lee, Dong-Ho ;
Nam, Sung-Ho .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) :3748-3764