Achieving nitritation and phosphorus removal in a continuous-flow anaerobic/oxic reactor through bio-augmentation

被引:19
作者
Ma, Bin [1 ]
Wang, Shuying [1 ]
Zhang, Shujun [2 ]
Li, Xiyao [1 ]
Bao, Peng [1 ]
Peng, Yongzhen [1 ]
机构
[1] Beijing Univ Technol, Key Lab Beijing Water Qual Sci & Water Environm R, Beijing 100124, Peoples R China
[2] Beijing Drainage Grp Co Ltd, Beijing 100022, Peoples R China
关键词
Bio-augmentation; Sewage; Nitritation; Biological phosphorus removal; Continuous flow anaerobic/oxic (A/O) reactor; DOMESTIC WASTE-WATER; AEROBIC A(2)O PROCESS; NITROGEN REMOVAL; BATCH REACTORS; BULKING-SLUDGE; ACCUMULATION; SEWAGE; NITRIFICATION;
D O I
10.1016/j.biortech.2013.02.077
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
The feasibility of achieving nitritation and phosphorus removal using bio-augmentation was investigated in a continuous-flow anaerobic/oxic (A/O) reactor treating sewage. The results indicated that nitritation could be quickly start-up, and reconstructed with an increase in the nitrite accumulation rate (NAR) from 1% to 89% within 15 days by using bio-augmentation and controlling DO at 0.96 mg/L. Biological phosphorus removal could be achieved with the average phosphorus removal efficiency of 96.43% when the NAR was maintained above 78.60%. Meanwhile, sludge settleablity was good with a sludge volume index (SVI) of between 62 and 102 mL/g even under high NAR. After nitritation and biological phosphorus removal were achieved, this A/O reactor has the potential to supply appropriate influent for the anammox UASB reactor. (c) 2013 Published by Elsevier Ltd.
引用
收藏
页码:375 / 378
页数:4
相关论文
共 17 条
[1]  
[Anonymous], 2006, STANDARD METHODS EXA, DOI DOI 10.5860/CHOICE.37-2792
[2]   Optimal operational factors for nitrite accumulation in batch reactors [J].
Bae, W ;
Baek, S ;
Chung, J ;
Lee, Y .
BIODEGRADATION, 2001, 12 (05) :359-366
[3]   Nitrogen removal from digester supernatant via nitrite - SBR or SHARON? [J].
Fux, C ;
Lange, K ;
Faessler, A ;
Huber, P ;
Grueniger, B ;
Siegrist, H .
WATER SCIENCE AND TECHNOLOGY, 2003, 48 (08) :9-18
[4]   Shortcut nitrification-denitrification by real-time control strategies [J].
Gao, Dawen ;
Peng, Yongzhen ;
Li, Baikun ;
Liang, Hong .
BIORESOURCE TECHNOLOGY, 2009, 100 (07) :2298-2300
[5]   Sewage Treatment with Anammox [J].
Kartal, B. ;
Kuenen, J. G. ;
van Loosdrecht, M. C. M. .
SCIENCE, 2010, 328 (5979) :702-703
[6]   Bulking sludge solved?! [J].
Kruit, J ;
Hulsbeek, J ;
Visser, A .
WATER SCIENCE AND TECHNOLOGY, 2002, 46 (1-2) :457-464
[7]   Performance of anammox UASB reactor treating low strength wastewater under moderate and low temperatures [J].
Ma, Bin ;
Peng, Yongzhen ;
Zhang, Shujun ;
Wang, Junmin ;
Gan, Yiping ;
Chang, Jiang ;
Wang, Shuying ;
Wang, Shanyun ;
Zhu, Guibing .
BIORESOURCE TECHNOLOGY, 2013, 129 :606-611
[8]   The feasibility of using a two-stage autotrophic nitrogen removal process to treat sewage [J].
Ma, Bin ;
Zhang, Shujun ;
Zhang, Liang ;
Yi, Peng ;
Wang, Junmin ;
Wang, Shuying ;
Peng, Yongzhen .
BIORESOURCE TECHNOLOGY, 2011, 102 (17) :8331-8334
[9]   Achieving nitrogen removal via nitrite in a pilot-scale continuous pre-denitrification plant [J].
Ma, Yong ;
Peng, Yongzhen ;
Wang, Shuying ;
Yuan, Zhiguo ;
Wang, Xiaolian .
WATER RESEARCH, 2009, 43 (03) :563-572
[10]   Filamentous bulking sludge - a critical review [J].
Martins, AMP ;
Pagilla, K ;
Heijnen, JJ ;
van Loosdrecht, MCM .
WATER RESEARCH, 2004, 38 (04) :793-817