共 50 条
[33]
An Optimization Design of the Exponentially Weighted Moving Average Control Chart
[J].
2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM),
2017,
:1719-1722
[37]
A maximum adaptive exponentially weighted moving average control chart for monitoring process mean and variability
[J].
QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT,
2020, 17 (01)
:16-31