Wind Farm Tie-line Protection Setting Based on Adaptive Current-Voltage Protection Principles

被引:0
作者
Lei Xian-guo [1 ]
Duan Jian-dong [1 ]
机构
[1] Xian Univ Technol, Dept Elect Engn, Xian, Peoples R China
来源
2012 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC) | 2012年
关键词
wind farm; tie-line protection; DFIG; adaptive current-voltage protection;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Wind farm tie-lines need to complete the relay protection, but existing tie-lines, or not set protect at wind farm side, or the protection may be affected by wind farm characteristic and misoperation. This paper first analyzes the DFIG short circuit current characteristics; draw DFIG short circuit current be closely connected with fault time, fault modes, the Crowbar circuit whether action, voltage dips degree, etc. So setting the tie-line protection based on adaptive current-voltage protection principles. Finally, paper establishes the simulation model that base on Northern Shaanxi Lang'ergou wind farm to test the protection, the simulation software is DIgSILENT. Test results show that the protection configuration scheme is feasible; it can distinguish the internal fault or external fault and with excellent properties.
引用
收藏
页数:4
相关论文
共 11 条
[1]   Development of adaptive protection scheme for distribution systems with high penetration of distributed generation [J].
Brahma, SM ;
Girgis, AA .
IEEE TRANSACTIONS ON POWER DELIVERY, 2004, 19 (01) :56-63
[2]  
Ge Y., 2007, NEW TYPES PROTECTIVE
[3]  
Hornak D, 2004, ANN CONF PROTECT REL, P110
[4]   An adaptive relaying for the protection of a wind farm interconnected with distribution networks [J].
Jang, SI ;
Choi, JH ;
Kim, JW ;
Choi, DM ;
Kim, KH .
2003 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, CONFERENCE PROCEEDINGS: BLAZING TRAILS IN ENERGY DELIVERY AND SERVICES, 2003, :296-302
[5]  
Jiang J L, 2010, RENEWABLE ENERGY RES, V28, P29
[6]   Dynamic behavior of the doubly fed induction generator during three-phase voltage dips [J].
Lopez, Jesus ;
Sanchis, Pablo ;
Roboam, Xavier ;
Marroyo, Luis .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2007, 22 (03) :709-717
[7]  
Lu J P, 2006, ELECTROTECHNICAL APP, V25, P56
[8]   Adaptive distance relay setting for lines connecting wind farms [J].
Pradhan, A. K. ;
Joos, Geza .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2007, 22 (01) :206-213
[9]  
Tueryun Y, 2009, RENEWABLE ENERGY RES, V27, P93
[10]  
Wang W Q, 2009, POWER SYSTEM TECHNOL, V33