Robust Dynamic Operation Optimization in Hot Rolling Production Process

被引:0
作者
Chen, Li [1 ]
Yang, Yang [2 ]
Yang, Lu [2 ]
机构
[1] Northeastern Univ, State Key Lab Synthet Automat Proc Ind, Logist Inst, Shenyang 110819, Shenyang Provin, Peoples R China
[2] Northeastern Univ, Logist Inst, Shenyang 110819, Shenyang Provin, Peoples R China
来源
2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA) | 2014年
关键词
shape control theory; dynamic programming; optimal control; robust optimization;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In hot rolling production process of iron and steel plant, the control of the strip shape is a challenging problem, since the set of the rolling schedule in operation optimization is dynamic with uncertainty, with consideration of the disturbance of the incoming information, the errors of the calculation models and the variations of the production parameters. In this paper, a model based on the shape survey control mathematics model for the robust dynamic operation optimization problem (RDOOP) is built which takes minimization of the crown and the flatness as the objective function. Dynamic programming method based on robust optimization is used to solve this problem. Computational results based on practical production data show that the proposed RDOOP model and dynamic programming have a certain application value for enhancing the level of shape control.
引用
收藏
页码:2751 / 2754
页数:4
相关论文
共 9 条
[1]  
[Anonymous], EUROPEAN J OPERATION
[2]   CONVEX PROGRAMMING WITH SET-INCLUSIVE CONSTRAINTS AND APPLICATIONS TO INEXACT LINEAR-PROGRAMMING [J].
SOYSTER, AL .
OPERATIONS RESEARCH, 1973, 21 (05) :1154-1157
[3]  
Sun Bao, 2010, Journal of the North University of China, V31, P193, DOI 10.3969/j.issn.1673-3193.2010.02.021
[4]   A robust optimization approach for pollution routing problem with pickup and delivery under uncertainty [J].
Tajik, N. ;
Tavakkoli-Moghaddam, R. ;
Vahdani, Behnam ;
Mousavi, S. Meysam .
JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (02) :277-286
[5]   Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production [J].
Tang, Lixin ;
Huang, Lin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 105 (02) :357-371
[6]   A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex [J].
Tang, LX ;
Liu, JY ;
Rong, AY ;
Yang, ZH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 124 (02) :267-282
[7]   Robust shape optimization of electromechanical devices [J].
Yoon, SB ;
Jung, IS ;
Hyun, DS ;
Hong, JP ;
Kim, YJ .
IEEE TRANSACTIONS ON MAGNETICS, 1999, 35 (03) :1710-1713
[8]  
Zhang Jianying, 2001, P1
[9]   A fuzzy algorithm for flatness control in hot strip mill [J].
Zhu, HT ;
Jiang, ZY ;
Tieu, AK ;
Wang, GD .
JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2003, 140 :123-128