A Case Study of DSM Method Applied to Urban Tunnel Construction

被引:0
作者
Lee, Hyung Jun [1 ]
Im, Jong-Chul [1 ]
Seo, Minsu [2 ]
机构
[1] Pusan Natl Univ, Dept Civil & Environm Engn, Busan, South Korea
[2] Pusan Natl Univ, Res Inst Ind Technol, Busan, South Korea
来源
ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING | 2019年 / 24卷 / 02期
关键词
Tunnel; Divided Shield Method; DSM; field measurement; settlement;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The tunnels are strengthened with rock bolts for stability according to the soil condition, which affects the superstructures. Moreover, the settlement of the superstructures can result from the excavation during tunnel construction. The Divided Shield Method (DSM) has been developed to solve these problems of tunnel construction in downtown areas. This study analyses site applicability in the downtown areas using an application case of DSM tunnels. It was found that the field measurement results for settlement amount and building inclination were smaller than the management standards, and the DSM was found to have almost no effect on the superstructures.
引用
收藏
页码:381 / 386
页数:6
相关论文
共 16 条
  • [1] Chen Xiangyu, 2018, ELECT J GEOTECHNICAL, P299
  • [2] Dai Chun-quan, 2014, ELECT J GEOTECHNICAL, P4189
  • [3] Gao Shi-Ming, 2014, ELECT J GEOTECHNICAL, P9799
  • [4] Haibin H., 2014, ELECT J GEOTECHNICAL, V19, P3377
  • [5] Hao Z., 2015, ELECT J GEOTECHNICAL, V20, P6557
  • [6] Jang Namju, 2019, [Journal of Korean Tunnelling and Underground Space Association, 한국터널지하공간학회 논문집], V21, P155, DOI 10.9711/KTAJ.2019.21.1.155
  • [7] Jorat M.E., 2011, ELECTRON J GEOTECH E, V16, P441
  • [8] Korean Geotechnical Society, 2015, MAN GUID DES CRIT ST
  • [9] Comparative study of construction methods for deep excavations above shield tunnels
    Li, Ming-Guang
    Chen, Jin-Jian
    Wang, Jian-Hua
    Zhu, Yan-Fei
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 71 : 329 - 339
  • [10] Li Wenpei, 2013, ELECT J GEOTECHNICAL, P1989