A Lagrangian based solution algorithm for a build-to-order supply chain network design problem

被引:15
作者
Shi, Jianmai [1 ,2 ]
Zhang, Guoqing [1 ]
Sha, Jichang [2 ]
机构
[1] Univ Windsor, Dept Ind & Mfg Syst Engn, Windsor, ON N9B 3P4, Canada
[2] Natl Univ Def Technol, Sch Informat Syst & Management, Changsha, Hunan, Peoples R China
关键词
Lagrangian relaxation; Build-to-order; Supply chain; Network design; Integer programming; Heuristic Algorithm; INVENTORY; SYSTEM; MANAGEMENT; POLICIES; DEMAND;
D O I
10.1016/j.advengsoft.2012.03.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents a Lagrangian based solution algorithm for the network design problem in a build-to-order (BTO) supply chain. The problem is to determine where to locate the distribution centers and to which distribution center or plant the retailers are assigned. The demand is assumed to be lead-time-dependent, and the balance between lead time and logistics costs is considered. Integer programming models are developed to formulate the problem. As it is difficult to obtain precisely optimal solution to this kind of problems, a Lagrangian based solution algorithm is developed to obtain near optimal solution. Problems involving hundreds of distribution centers and retailers are used to test the algorithm. Computational results show that the Lagrangian based algorithm can present very good solutions to all the examples in short CPU time. Scenario analyses and some managerial insights are reported. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:21 / 28
页数:8
相关论文
共 28 条
[1]  
[Anonymous], 1999, Integer Programming and Combinatorial Optimization
[2]  
Business W, 2001, BUSINESS WIRE 0208
[3]  
Chang HJ, 1999, J OPER RES SOC, V50, P1176, DOI 10.2307/3010088
[4]   Knowledge management approach in build-to-order supply chains [J].
Chow, Harry K. H. ;
Choy, K. L. ;
Lee, W. B. .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2007, 107 (5-6) :882-919
[5]   ASSIGNMENT OF TOOLS TO MACHINES IN A FLEXIBLE MANUFACTURING SYSTEM [J].
DALFONSO, TH ;
VENTURA, JA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (01) :115-133
[6]   Fuzzy scheduling of a build-to-order supply chain [J].
Demirli, Kudret ;
Yimer, Alebachew D. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (14) :3931-3958
[7]  
Elias S., 2000, 3 DAY CAR ANN YEAR E
[8]   Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers - Production, manufacturing and logistics [J].
Eskigun, E ;
Uzsoy, R ;
Preckel, PV ;
Beaujon, G ;
Krishnan, S ;
Tew, JD .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (01) :182-206
[9]   Outbound supply chain network design with mode selection and lead time considerations [J].
Eskigun, Erdem ;
Uzsoy, Reha ;
Preckel, Paul V. ;
Beaujon, George ;
Krishnan, Subramanian ;
Tew, Jeffrey D. .
NAVAL RESEARCH LOGISTICS, 2007, 54 (03) :282-300
[10]   Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity [J].
Fu, Ke ;
Hsu, Vernon Ning ;
Lee, Chung-Yee .
OPERATIONS RESEARCH, 2006, 54 (06) :1137-1150