Noninvasive Test Scheduling in Live Electricity Markets at Transpower New Zealand

被引:1
作者
Batstone, Steve [1 ,2 ]
Pritchard, Geoff [3 ]
Zakeri, Golbon [4 ]
机构
[1] Whiteboard Energy, Auckland 1143, New Zealand
[2] Sapere Res Grp, Auckland 1140, New Zealand
[3] Univ Auckland, Dept Stat, Auckland 1010, New Zealand
[4] Univ Auckland, Dept Engn Sci, Auckland 1010, New Zealand
关键词
stochastic dynamic programming; scheduling; electricity; financial derivatives; SYSTEM;
D O I
10.1287/inte.2016.0865
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In 2013, Transpower New Zealand commissioned a new high-voltage, direct current link to transfer electrical power between the North and South Islands of New Zealand. This was a substantial and prolonged undertaking, requiring approximately 400 in-situ capability tests. Transpower elected to perform these tests "live," without suspending the normal operation of the wholesale electricity market. Instead, Transpower's trading team attempted to create suitable flow conditions for each test by entering into innovative financial derivative contracts with power generation firms. We created a stochastic dynamic programming model to handle the contingent scheduling of the tests; its most important random variable was the state of water storage available to hydropower plants.
引用
收藏
页码:482 / 492
页数:11
相关论文
共 14 条
  • [1] A security-constrained bid-clearing system for the New Zealand Wholesale Electricity Market
    Alvey, T
    Goodwin, D
    Ma, XW
    Streiffert, D
    Sun, D
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (02) : 340 - 346
  • [2] Birge JR, 2011, SPRINGER SER OPER RE, P3, DOI 10.1007/978-1-4614-0237-4
  • [3] Chao H., 1998, Designing Competitive Electricity Markets, V1st
  • [4] Bridge network maintenance optimization using stochastic dynamic programming
    Frangopol, Dan M.
    Liu, Ming
    [J]. JOURNAL OF STRUCTURAL ENGINEERING, 2007, 133 (12) : 1772 - 1782
  • [5] Gill P., 2009, ELECT POWER EQUIPMEN, V2nd
  • [6] Positioning for a competitive electric industry with PG&E's hydro-thermal optimization model
    Johnson, RB
    Svoboda, AJ
    Greif, C
    Vojdani, A
    Zhuang, FL
    [J]. INTERFACES, 1998, 28 (01) : 53 - 74
  • [7] Dynamic workforce scheduling for British telecommunications plc
    Lesaint, D
    Voudouris, C
    Azarmi, N
    [J]. INTERFACES, 2000, 30 (01) : 45 - 56
  • [8] A Review of Operations Research in Mine Planning
    Newman, Alexandra M.
    Rubio, Enrique
    Caro, Rodrigo
    Weintraub, Andres
    Eurek, Kelly
    [J]. INTERFACES, 2010, 40 (03) : 222 - 245
  • [9] MULTISTAGE STOCHASTIC OPTIMIZATION APPLIED TO ENERGY PLANNING
    PEREIRA, MVF
    PINTO, LMVG
    [J]. MATHEMATICAL PROGRAMMING, 1991, 52 (02) : 359 - 375
  • [10] Ryan H., 2001, HIGH VOLTAGE ENG TES, V1st