Multi-time scale trading profit model of pumped storage power plant for electricity market

被引:6
作者
Luo, Yanhong [1 ,2 ]
Zhang, Shiwen [1 ,2 ]
Zhou, Bowen [1 ,2 ]
Li, Guangdi [1 ,2 ]
Hu, Bo [3 ]
Liu, Yubo [4 ]
Xiao, Zhaoxia [5 ]
机构
[1] Northeastern Univ, Coll Informat Sci & Engn, Shenyang, Peoples R China
[2] Northeastern Univ, Key Lab Integrated Energy Optimizat & Secure Opera, Shenyang, Peoples R China
[3] State Grid Liaoning Elect Power Co Ltd, Shenyang, Peoples R China
[4] State Grid Liaoning Elect Power Co Ltd, Informat & Telecommun Branch, Shenyang, Peoples R China
[5] Tiangong Univ, Sch Elect Engn, Tianjin, Peoples R China
基金
中国国家自然科学基金;
关键词
cost-benefit analysis; power markets; risk analysis; energy storage; multi-time scale; ENERGY-STORAGE; OPTIMIZATION MODEL; DISPATCH; SYSTEM; IMPACT; SPOT;
D O I
10.3389/fenrg.2022.975319
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Pumped storage power plant (PSPP) has the upper hand on economy and cleanness. It also has the functions of frequency regulation, phase regulation, and spare, which have been instrumental in maintaining the stability of power system operation. But now the mechanism for PSPP to become involved in electricity market transactions in China is imperfect. How to properly establish a multi-time scale trading profit model and reasonably allocate the capacity of PSPP has been instrumental in realizing the economic operation of the power system. So, this article analyzes the mechanism for PSPP to become involved in electricity market trading by providing combined electricity supply services and ancillary services, and establishes an optimization model with respect to economic optimization. At the same time, considering the volatility of electricity prices in the spot market, the risk of PSPP becoming involved in electricity market trading is measured by conditional Value at Risk (CVaR) to achieve economic optimization while minimizing the risk. The case studies demonstrate that the proposed profit model can enhance the revenue and decrease the risk of PPSP.
引用
收藏
页数:13
相关论文
共 50 条
[21]   Multi-time scale market participation strategy of wind-energy storage combined system considering uncertainty [J].
Sun X. ;
Wei W. ;
Li Q. ;
Yao F. ;
Liu Y. ;
Zhang Y. ;
Miao S. .
Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2024, 44 (02) :18-25
[22]   Multi-time scale of new energy scheduling optimization for virtual power plant considering uncertainty of wind power and photovoltaic power [J].
Zhang D. ;
Yun Y. ;
Wang X. ;
He J. .
Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2022, 43 (11) :529-537
[23]   Virtual power plant with energy storage optimized in an electricity market approach [J].
Lazaroiu, G. C. ;
Dumbrava, V. ;
Leva, S. ;
Roscia, M. ;
Teliceanu, M. .
2015 INTERNATIONAL CONFERENCE ON CLEAN ELECTRICAL POWER (ICCEP), 2015, :333-338
[24]   A Multi-time Scale Coordinated Real Time Dispatch Model of CCHP-based Microgrid [J].
Kang, Kai ;
Deng, Shaoping ;
Wu, Sha ;
Zhong, Taijun ;
Wu, Xiong ;
Wang, Zhao .
2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, :1613-1621
[25]   Multi-Time Scale Home Energy Management Strategy Based on Electricity Demand Response [J].
Zhang Y. ;
Kong X. ;
Sun B. ;
Wang J. .
Dianwang Jishu/Power System Technology, 2018, 42 (06) :1811-1818
[26]   Multi-time scale fuzzy chance constrained dynamic economic dispatch model for power system with wind power [J].
Zhai J. ;
Ren J. ;
Zhou M. ;
Li Z. .
Dianwang Jishu/Power System Technology, 2016, 40 (04) :1094-1099
[27]   Multi-time Scale Active Power Optimal Dispatch in Wind Power Cluster Based on Model Predictive Control [J].
Lu P. ;
Ye L. ;
Tang Y. ;
Zhang C. ;
Zhong W. ;
Sun B. ;
Zhai B. ;
Qu Y. ;
Liu X. .
Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2019, 39 (22) :6572-6582
[28]   Pumped storage hydro power's function in the electricity market under the electricity deregulation background in China - A case study of Fujian province [J].
Mou, Dunguo .
ENERGY & ENVIRONMENT, 2019, 30 (06) :951-968
[29]   Breaking time-scale boundary: An optimization framework for improving multi-timescale operation characteristics of pumped storage power plant [J].
Lei, Liuwei ;
Xiao, Yu ;
Gao, Yuanqiang ;
Chen, Diyi ;
Zhao, Ziwen ;
Zhou, Ye ;
Chen, Hongyu ;
Mahmud, Md Apel .
APPLIED ENERGY, 2025, 398
[30]   Multi-time scale joint optimal scheduling for wind-photovoltaic-electrochemical energy storage-pumped storage considering renewable energy uncertainty [J].
Huang W. ;
Li Y. ;
Li J. ;
Liu Y. ;
Wu F. ;
Wang Z. .
Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (04) :91-98