Repair of Corroded Prestressed Concrete Piles of Harbor Landing Stages. Discussion

被引:0
|
作者
Marti-Vargas, Jose R. [1 ]
机构
[1] Univ Politecn Valencia, Inst Concrete Sci & Technol, ICITECH, E-46071 Valencia, Spain
关键词
TRANSFER LENGTH; PRETENSIONED CONCRETE; STRAND; BOND; REINFORCEMENT; SLIP;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:707 / 708
页数:2
相关论文
共 7 条
  • [1] Repair of corroded prestressed concrete piles of harbor landing stages
    ICITECH, Institute of Concrete Science and Technology, Universitat Politècnica de València, Valencia, Spain
    ACI Struct J, 2013, 4 (707-708):
  • [2] Repair of Corroded Prestressed Concrete Piles of Harbor Landing Stages
    Lin, Tseng-Cheng
    Jeng, Chyuan-Hwan
    Wang, Chung-Yue
    Jou, Ting-Hung
    ACI STRUCTURAL JOURNAL, 2012, 109 (05) : 715 - 725
  • [3] Seismic finite element simulation of concrete piles in harbour landing stages
    Jeng, Chyuan-Hwan
    Chen, Jie-Ru
    Lin, Tseng-Cheng
    Peng, Sheng-Fu
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2014, 10 (09) : 1146 - 1160
  • [4] ANALYSIS OF CORRODED REINFORCED-CONCRETE SECTIONS FOR REPAIR - DISCUSSION
    NOKHASTEH, MA
    EYRE, JR
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1992, 118 (09): : 2634 - 2636
  • [5] Innovative Approach to Repair Corroded Steel Piles using Ultra-High Performance Concrete
    Shrestha, Binod
    Gheni, Ahmed
    Abdulazeez, Mohanad M.
    ElGawady, Mohamed A.
    TRANSPORTATION RESEARCH RECORD, 2020, 2674 (12) : 1 - 14
  • [6] Discussion of "Comprehensive Load Test on Prestressed Concrete Piles in Alluvial Clays and Marl in Savannah, Georgia" by Yong Tan and Guoming Lin
    Lam, C.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2015, 29 (01)
  • [7] Mechanical Performance Monitoring for Prestressed Concrete Piles Used in a Newly- Built High-Piled Wharf in a Harbor with Fiber Bragg Grating Sensor Technology When Pile Driving
    Liu, Hongbiao
    Zhang, Qiang
    Ren, Liang
    APPLIED SCIENCES-BASEL, 2017, 7 (05):