Spallation neutron source high power RF installation and commissioning progress

被引:0
|
作者
McCarthy, M [1 ]
Anderson, D [1 ]
Fuja, R [1 ]
Gurd, P [1 ]
Hardek, T [1 ]
Kang, Y [1 ]
Bradley, J [1 ]
Young, K [1 ]
Rees, D [1 ]
Roybal, W [1 ]
机构
[1] Oak Ridge Natl Lab, Oak Ridge, TN 37831 USA
来源
2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4 | 2005年
关键词
D O I
暂无
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The Spallation Neutron Source (SNS) linac will provide a 1 GeV proton beam for injection into the accumulator ring. In the normal conducting (NC) section of this linac, the Radio Frequency Quadupole (RFQ) and six drift tube linac (DTL) tanks are powered by seven 2.5 MW, 402.5 MHz klystrons and the four coupled cavity linac (CCL) cavities are powered by four 5.0 MW, 805 MHz klystrons. Eighty-one 550 kW, 805 MHz klystrons each drive a single cavity in the superconducting (SC) section of the linac. The high power radio frequency (HPRF) equipment was specified and procured by LANL and tested before delivery to ensure a smooth transition from installation to commissioning. Installation of RF equipment to support klystron operation in the 350-meter long klystron gallery started in June 2002. The final klystron was set in place in September 2004. Presently, all RF stations have been installed and high power testing has been completed. This paper reviews the progression of the installation and testing of the HPRF Systems.
引用
收藏
页码:4295 / 4297
页数:3
相关论文
共 50 条
  • [1] Spallation neutron source high-power RF transmitter design for high availability, ease of installation and cost containment
    Bradley, J
    Rees, D
    Hardek, T
    Lynch, M
    Roybal, W
    Tallerico, P
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 1458 - 1460
  • [2] The Spallation Neutron Source diagnostics: Initial integration and commissioning progress report
    Assadi, S
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 498 - 502
  • [3] Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector
    Welton, R. F.
    Han, B. X.
    Stockli, M. P.
    Murray, S. N.
    Pennisi, T. R.
    Stinson, C.
    Barnett, W.
    Aleksandrov, A.
    Piller, M.
    Saethre, R.
    Kang, Y.
    Zhukov, A.
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2020, 91 (01):
  • [4] Commissioning of the spallation neutron source accelerator systems
    Plum, M. A.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2471 - 2475
  • [5] Spallation Neutron Source Superconducting linac commissioning algorithms
    Henderson, S
    Campisi, I
    Galambos, J
    Jeon, D
    Zhang, Y
    2005 IEEE PARTICLE ACCELERATOR CONFERENCE (PAC), VOLS 1-4, 2005, : 237 - 239
  • [6] Commissioning of the spallation neutron source front end systems
    Aleksandrov, A
    PROCEEDINGS OF THE 2003 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, 2003, : 65 - 69
  • [7] Commissioning of cryogenic system for China Spallation Neutron Source
    Ye Bin
    He Chongchao
    Li Na
    Ding Meiying
    Wang Yaqiong
    Zhang Yu
    He Kun
    ADVANCES IN CRYOGENIC ENGINEERING, 2017, 278
  • [8] Commissioning of the superconducting Linac at the spallation neutron source (SNS)
    Kim, Sang-ho
    Campisi, Isidoro E.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2007, 17 (02) : 1299 - 1304
  • [9] Software tools for commissioning of the Spallation Neutron Source Linac
    Galambos, J.
    Aleksandrov, A.
    Allen, C. K.
    Henderson, S.
    Shishlo, A.
    Pelaia, T.
    Zhang, Y.
    Chu, C. P.
    2007 IEEE PARTICLE ACCELERATOR CONFERENCE, VOLS 1-11, 2007, : 2556 - +
  • [10] Commissioning of the 1 MW spallation neutron source SINQ
    Bauer, GS
    Fischer, WE
    Rohrer, U
    Schryber, U
    PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS, 1998, : 3785 - 3787