A Bayesian Approach to Improve Estimate at Completion in Earned Value Management

被引:36
作者
Caron, Franco [1 ]
Ruggeri, Fabrizio [2 ]
Merli, Alessandro [3 ]
机构
[1] Politecn Milan, Dept Management Econ & Ind Engn, I-20133 Milan, Italy
[2] CNR IMATI, Milan, Italy
[3] BvTech SpA, Milan, Italy
关键词
project control; earned value management; estimate at completion; Bayesian approach;
D O I
10.1002/pmj.21303
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Forecasting represents a core project management process. Estimates at completion in terms of cost and schedule provide essential data and advice to the project team in order to lead and control the project and implement suitable corrective measures. In order to improve the forecasting process, a Bayesian model has been developed within the earned value management framework aiming to calculate a confidence interval for the estimates of both cost and schedule at the completion of the project. The model is based on the integration of data records and qualitative knowledge provided by experts. The model has been tested in an oil and gas project.
引用
收藏
页码:3 / 16
页数:14
相关论文
共 23 条
[1]  
Anbari F.T., 2003, PROJ MANAG J, V34, P12, DOI [10.1109/EMR.2004.25113, DOI 10.1177/875697280303400403, 10.1177/875697280303400403]
[2]  
[Anonymous], PROJ MANAG J
[3]  
[Anonymous], 2008, GUID PROJ MAN BOD KN
[4]  
[Anonymous], 2003, Applied Bayesian modeling
[5]  
[Anonymous], 2006, Introduction to Time Series and Forecasting
[6]  
Christensen D.S., 1993, NAT CON MAN J, V25, P17
[7]  
Christensen D.S., 1996, J COST ANAL, P35, DOI DOI 10.1080/08823871.1996.10462298
[8]  
DAgostini G., 2003, BAYESIAN REASONING D
[9]  
De Finetti Bruno., 1977, Bull. Amer. Math. Soc, V83, P94, DOI [DOI 10.1090/S0002-9904-1977-14188-8PII, 10.1090/S0002-9904-1977-14188-8 PII]
[10]  
Fleming Quentin, 1992, COST SCHEDULE CONTRO