Bounded parallel-batching scheduling with two competing agents

被引:41
作者
Fan, B. Q. [1 ,2 ,3 ]
Cheng, T. C. E. [2 ]
Li, S. S. [3 ]
Feng, Q. [3 ]
机构
[1] Ludong Univ, Dept Math & Informat, Yantai 264025, Shandong, Peoples R China
[2] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
[3] Zhengzhou Univ, Dept Math, Zhengzhou 450001, Henan, Peoples R China
关键词
Scheduling; Competitive agents; Parallel-batch; Complexity; Dynamic programming; TOTAL COMPLETION-TIME; SINGLE-MACHINE; PROCESSING MACHINE; MINIMIZE; ALGORITHMS;
D O I
10.1007/s10951-012-0274-0
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a scheduling problem in which two agents, each with a set of non-preemptive jobs, compete to perform their jobs on a common bounded parallel-batching machine. Each of the agents wants to minimize an objective function that depends on the completion times of its own jobs. The goal is to schedule the jobs such that the overall schedule performs well with respect to the objective functions of both agents. We focus on minimizing the makespan or the total completion time of one agent, subject to an upper bound on the makespan of the other agent. We distinguish two categories of batch processing according to the compatibility of the agents. In the case where the agents are incompatible, their jobs cannot be processed in the same batch, whereas all the jobs can be processed in the same batch when the agents are compatible. We show that the makespan problem can be solved in polynomial time for the incompatible case and is NP-hard in the ordinary sense for the compatible case. Furthermore, we show that the latter admits a fully polynomial-time approximation scheme. We prove that the total completion time problem is NP-hard and is polynomially solvable for the incompatible case with a fixed number of job types.
引用
收藏
页码:261 / 271
页数:11
相关论文
共 29 条
[1]   Scheduling problems with two competing agents [J].
Agnetis, A ;
Mirchandani, PB ;
Pacciarelli, D ;
Pacifici, A .
OPERATIONS RESEARCH, 2004, 52 (02) :229-242
[2]   Multi-agent single machine scheduling [J].
Agnetis, Alessandro ;
Pacciarelli, Dario ;
Pacifici, Andrea .
ANNALS OF OPERATIONS RESEARCH, 2007, 150 (01) :3-15
[3]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theory of NP-Completeness
[4]   A multiple-criterion model for machine scheduling [J].
Baker, KR ;
Smith, JC .
JOURNAL OF SCHEDULING, 2003, 6 (01) :7-16
[5]   Batching identical jobs [J].
Baptiste, P .
MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2000, 52 (03) :355-367
[6]  
Brucker P., 1998, Journal of Scheduling, V1, P31, DOI 10.1002/(SICI)1099-1425(199806)1:1<31::AID-JOS4>3.0.CO
[7]  
2-R
[8]  
Brucker P., 2011, COMPLEXITY RESULTS S
[9]  
Brucker P., 2006, SCHEDULING ALGORITHM
[10]   MINIMIZING TOTAL COMPLETION-TIME ON A BATCH PROCESSING MACHINE WITH JOB FAMILIES [J].
CHANDRU, V ;
LEE, CY ;
UZSOY, R .
OPERATIONS RESEARCH LETTERS, 1993, 13 (02) :61-65