Effect of the transmission configuration of wind farms on their capacity factors

被引:10
作者
Cheng, Hong-Ping [1 ]
Yu, Ming-Ta [2 ]
机构
[1] Natl Taipei Univ Technol, Dept Energy & Refrigerating Air Conditioning Engn, Taipei 10608, Taiwan
[2] Natl Taipei Univ Technol, Grad Inst Mech & Elect Engn, Taipei 10608, Taiwan
关键词
Capacity factor; CO2; emission; Transmission loss; Wind farm; Wind-power density; POWER; GENERATION; CONNECTION; MANAGEMENT; EMISSIONS; MARKETS; DESIGN; IMPACT;
D O I
10.1016/j.enconman.2012.12.011
中图分类号
O414.1 [热力学];
学科分类号
摘要
This study conducted a feasibility study to analyze and improve the operational performance of two current onshore wind farms on the Changhua coastal area in Taiwan. We selected two adjacent wind farms A and B with similar wind-power density and geographical conditions; whereas, their main differences were the material of cables, the type of transformers, the number of cable branches, and the depth of buried cables. In actual operation states, the wind farm A had greater capacity factor than the wind farm B; therefore, the wind farm A was regarded as a base case, and two new wind farms I B and 2B, resulting from the changes in the cable materials, transformer types, cable branches, and buried cable depth of the wind farm B, were proposed to assess the feasibility of system improvement. Results showed that the material of cables, the type of transformers, the number of cable branches, and the depth of buried cables were the crucial factors of affecting the efficiency of wind farm B. Shallow cabling increased the temperature of cables, higher temperature causing a decline in cable capacity, and this phenomenon was crucial to aluminum cables rather than copper cables. The results of comparing the wind farms 2B with B indicated that the maximal transmission loss of cables was reduced by 6.4 GW h/year, and the maximal annual CO2 emission was reduced by 4.5 kt/year. Additionally, the increased cost of transformers and cabling was recovered in 2.12 years, when the wind farm B was modified to 2B before construction. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:326 / 335
页数:10
相关论文
共 33 条
[1]   Evaluating the impact of electrical grid connection on the wind turbine performance for Hofa wind farm scheme in Jordan [J].
Abderrazzaq, M. H. ;
Aloquili, O. .
ENERGY CONVERSION AND MANAGEMENT, 2008, 49 (11) :3376-3380
[2]   Wind energy as a potential generation source at Ras Benas, Egypt [J].
Ahmed, Ahmed Shata .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2010, 14 (08) :2167-2173
[3]   Coordinated reactive power management in power networks with wind turbines and FACTS devices [J].
Amaris, Hortensia ;
Alonso, Monica .
ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (07) :2575-2586
[4]  
[Anonymous], P 18 BRIT WIND EN AS
[5]  
[Anonymous], 2010, TECHNICAL MANUAL OF
[6]  
[Anonymous], 2007, TAIPEI WORLD TRADE C
[7]  
Bowen A.J., 1996, RISO CONTRIBUTION DE, V96, P23
[8]   An evolutive algorithm for wind farm optimal design [J].
Castro Mora, Jose ;
Calero Baron, Jose M. ;
Riquelme Santos, Jesus M. ;
Burgos Payan, Manuel .
NEUROCOMPUTING, 2007, 70 (16-18) :2651-2658
[9]   Wind farm-A power source in future power systems [J].
Chen, Z. ;
Blaabjerg, F. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2009, 13 (6-7) :1288-1300
[10]   Comparative study of the power production and noise emissions impact from two wind farms [J].
Chourpouliadis, Christos ;
Ioannou, Eleni ;
Koras, Andreas ;
Kalfas, Anestis I. .
ENERGY CONVERSION AND MANAGEMENT, 2012, 60 :233-242