A Tool for Comparing Resource-Constrained Project Scheduling Problem Algorithms

被引:0
作者
Olteanu, Alexandru-Liviu [1 ]
机构
[1] Lucian Blaga Univ Sibiu, Fac Engn, Comp Sci & Automated Control, Str Emil Cioran 4, Sibiu 550025, Romania
来源
AIC '09: PROCEEDINGS OF THE 9TH WSEAS INTERNATIONAL CONFERENCE ON APPLIED INFORMATICS AND COMMUNICATIONS: RECENT ADVANCES IN APPLIED INFORMAT AND COMMUNICATIONS | 2009年
关键词
Resource-Constrained Project Scheduling Problem; RCPSP; Ant Colony Optimization; ACO; Genetic; Beam-search; Scheduling; Simulation; GENETIC ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
There are a multitude of optimization problems that are difficult to solve and for which many algorithms have been developed. One area of these problems is scheduling, where a large range of constraints need to be upheld, making the problems NP-hard. The aim of this paper is to present a tool for comparing different methods for the Resource-Constrained Project Scheduling Problem.
引用
收藏
页码:182 / +
页数:2
相关论文
共 50 条
[31]   A convolutional neural network for the resource-constrained project scheduling problem (RCPSP): A new approach [J].
Golab, Amir ;
Gooya, Ehsan Sedgh ;
Al Falou, Ayman ;
Cabon, Mikael .
DECISION SCIENCE LETTERS, 2023, 12 (02) :225-238
[32]   Hybrid multimode resource-constrained maintenance project scheduling problem [J].
Kosztyan, Zsolt T. ;
Pribojszki-Nemeth, Aniko ;
Szalkai, Istvan .
OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
[33]   An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem [J].
Peng, L. ;
Wuliang, P. .
Open Mechanical Engineering Journal, 2014, 8 (01) :9-13
[34]   A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem [J].
Goncharov E.N. .
Journal of Applied and Industrial Mathematics, 2022, 16 (04) :672-683
[35]   A hybrid evolutionary algorithm for the resource-constrained project scheduling problem [J].
Thammano A. ;
Phu-ang A. .
Artificial Life and Robotics, 2012, 17 (02) :312-316
[36]   A survey of variants and extensions of the resource-constrained project scheduling problem [J].
Hartmann, Soenke ;
Briskorn, Dirk .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) :1-14
[37]   A resource-constrained project scheduling problem with fuzzy activity times [J].
Zoulfaghari H. ;
Nematian J. ;
Nezhad A.A.K. .
International Journal of Fuzzy System Applications, 2016, 5 (04) :1-15
[38]   A competitive Genetic Algorithm for resource-constrained project scheduling problem [J].
Wang, H ;
Lin, D ;
Li, MQ .
Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, :2945-2949
[39]   A branch and bound algorithm for the resource-constrained project scheduling problem [J].
Brucker, P ;
Knust, S ;
Schoo, A ;
Thiele, O .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) :272-288
[40]   Extending the resource-constrained project scheduling problem for disruption management [J].
Kuster, Juergen ;
Jannach, Dietmar .
2006 3RD INTERNATIONAL IEEE CONFERENCE INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2006, :91-98