A Tool for Comparing Resource-Constrained Project Scheduling Problem Algorithms

被引:0
作者
Olteanu, Alexandru-Liviu [1 ]
机构
[1] Lucian Blaga Univ Sibiu, Fac Engn, Comp Sci & Automated Control, Str Emil Cioran 4, Sibiu 550025, Romania
来源
AIC '09: PROCEEDINGS OF THE 9TH WSEAS INTERNATIONAL CONFERENCE ON APPLIED INFORMATICS AND COMMUNICATIONS: RECENT ADVANCES IN APPLIED INFORMAT AND COMMUNICATIONS | 2009年
关键词
Resource-Constrained Project Scheduling Problem; RCPSP; Ant Colony Optimization; ACO; Genetic; Beam-search; Scheduling; Simulation; GENETIC ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
There are a multitude of optimization problems that are difficult to solve and for which many algorithms have been developed. One area of these problems is scheduling, where a large range of constraints need to be upheld, making the problems NP-hard. The aim of this paper is to present a tool for comparing different methods for the Resource-Constrained Project Scheduling Problem.
引用
收藏
页码:182 / +
页数:2
相关论文
共 22 条
[1]  
Angus D., 2006, Ant colony Optimization: From Biological inspiration to an Algorithmic Framework
[2]  
[Anonymous], 1996, A genetic algorithm for resource-constrained scheduling
[3]  
[Anonymous], 1998, SCHEDULING ALGORITHM
[4]  
Brucker P., 1995, Scheduling Algorithms
[5]  
Brucker P., 1998, SCHEDULING ALGORITHM, V2nd
[6]  
Dorigo M, 2005, ANT COLONY OPTIMIZAT
[7]   A self-adapting genetic algorithm for project scheduling under resource constraints [J].
Hartmann, S .
NAVAL RESEARCH LOGISTICS, 2002, 49 (05) :433-448
[8]  
Jovanovic Raka, 2008, WSEAS Transactions on Computers, V7, P1948
[9]  
JOVANOVIC R, 2008, MATH COMPUTERS SCI E, P94
[10]  
Jovanovic R, 2009, ARTIF INT SER WSEAS, P490