Some structural properties for the just-in-time level schedule problem

被引:13
作者
Aigbedo, H [1 ]
机构
[1] Univ Tsukuba, Inst Policy & Planning Sci, Tsukuba, Ibaraki 3058573, Japan
关键词
just-in-time; level schedule; sequencing; assembly systems; mixed-models;
D O I
10.1080/095372800232081
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Just-in-time (JIT) is a pull concept applied mainly in repetitive manufacturing systems, and it is characterized by a scenario where only the required units are produced in the required quantities at the required times. It particularly aims at eliminating wastes associated with inventories in the system. A level schedule is desirable for a JIT assembly system, as it serves as an approximation for all forms of smoothing. The minsum formulation of the assembly line level schedule problem is one of those that has been mainly used in the literature. Using this formulation as a base, we develop some useful structural properties for the problem. Among other things, it is shown that a level schedule would tend to be more difficult to achieve for products (models) with comparatively fewer units in the products composition structure.
引用
收藏
页码:357 / 362
页数:6
相关论文
共 9 条