A Novel Priority-Slot Based Continuous-Time Formulation for Crude-Oil Scheduling Problems

被引:98
作者
Mouret, Sylvain [1 ]
Grossmann, Ignacio E. [1 ]
Pestiaux, Pierre [2 ]
机构
[1] Carnegie Mellon Univ, Dept Chem Engn, Pittsburgh, PA 15213 USA
[2] Total Refining & Mkt, Div Res, F-76700 Harfleur, France
关键词
GLOBAL OPTIMIZATION; BATCH-OPERATIONS;
D O I
10.1021/ie8019592
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The optimal scheduling of crude-oil operations in refineries has been studied by various groups during the past decade leading to different mixed integer linear programming (MILP) or mixed integer nonlinear programming (MINLP) formulations. This paper presents a new continuous-time formulation, called single-operation sequencing (SOS) model, which can be used to solve a crude-oil operations problem introduced in previous publications. It is different from previous formulations as it requires to postulate the number of priority-slots in which operations take place, instead of specifying the number of time intervals or event points to be used in the schedule. This MINLP model is also based on the representation of a Crude-oil schedule by a single sequence of transfer operations. It allows breaking symmetries involved in the problem, thus enormously reducing the computational times (all instances can be solved within 2 min). A simple two step MILP-NLP procedure has been used to solve the nonconvex MINLP model leading to an optimality gap lower than 4% in all cases.
引用
收藏
页码:8515 / 8528
页数:14
相关论文
共 25 条
[1]  
Baptiste Philippe, 2001, INT SER OPER RES MAN, V39
[2]  
COTE MC, 2007, C INT AI OR TECHN CO, P29
[3]   Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review [J].
Floudas, CA ;
Lin, XX .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (11) :2109-2129
[4]   A robust event-based continuous time formulation for tank transfer scheduling [J].
Furman, Kevin C. ;
Jia, Zhenya ;
Ierapetritou, Marianthi G. .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2007, 46 (26) :9126-9136
[5]  
Hopcroft J., 1979, Introduction to automata theory, languages, and computation
[6]   Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4341-4359
[7]   Refinery short-term scheduling using continuous time formulation: Crude-oil operations [J].
Jia, ZY ;
Ierapetritou, M ;
Kelly, JD .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (13) :3085-3097
[8]   Planning and scheduling in the process industry [J].
Kallrath J. .
OR Spectrum, 2002, 24 (3) :219-250
[9]   Global optimization for scheduling refinery crude oil operations [J].
Karuppiah, Ramkumar ;
Furman, Kevin C. ;
Grossmann, Ignacio E. .
COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (11) :2745-2766
[10]  
Kelly JD, 2003, HYDROCARB PROCESS, V82, P47