Hybrid approach to production scheduling using genetic algorithm and simulation

被引:29
作者
Jeong, SJ [1 ]
Lim, SJ [1 ]
Kim, KS [1 ]
机构
[1] Yonsei Univ, Dept Ind Syst Engn, Seoul 120749, South Korea
关键词
genetic algorithm; hybrid approach; production scheduling; simulation;
D O I
10.1007/s00170-004-2345-7
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In the production scheduling problem, due to various kinds of uncertain factors such as queuing, breakdowns and repairing time of machines, the optimal solution considering the stochastic behaviour of a real operation cannot be easily solved. To solve the problem, we present a hybrid approach with a genetic algorithm (GA) and a simulation. The GA is used for optimization of schedules, and the simulation is used to minimize the maximum completion time for the last job with fixed schedules from the GA model. We obtain more realistic production schedules with an optimal completion time reflecting stochastic characteristics by performing the iterative hybrid GA - simulation procedure. It has been shown that the hybrid approach is powerful for complex production scheduling.
引用
收藏
页码:129 / 136
页数:8
相关论文
共 12 条
[1]  
BIERWIRTH C, 1995, OR SPEKTRUM, V17, P87, DOI 10.1007/BF01719250
[2]   Production planning using a hybrid simulation - analytical approach [J].
Byrne, MD ;
Bakir, MA .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 59 (1-3) :305-311
[3]   EVOLUTION BASED LEARNING IN A JOB-SHOP SCHEDULING ENVIRONMENT [J].
DORNDORF, U ;
PESCH, E .
COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (01) :25-40
[4]  
Dorndorf U, 1993, APMOD93 P PREPR BUD, P142
[5]   Genetic algorithms for the job-shop scheduling problem with unrelated parallel constraints: heuristic mixing method machines and precedence [J].
Ghedjati, F .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 37 (1-2) :39-42
[6]   Production-distribution planning in supply chain considering capacity constraints [J].
Lee, YH ;
Kim, SH .
COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 43 (1-2) :169-190
[7]   An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate [J].
Sakawa, M ;
Mori, T .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (02) :325-341
[8]   A UNIFYING VIEW OF HYBRID SIMULATION ANALYTIC MODELS AND MODELING [J].
SHANTHIKUMAR, JG ;
SARGENT, RG .
OPERATIONS RESEARCH, 1983, 31 (06) :1030-1052
[9]  
Syswerda G, 1991, HDB GENETIC ALGORITH, P332
[10]  
YAMADA T, 1992, GENETIC ALGORITHM AP, V2, P281