We consider a two-machine flowshop scheduling problem where the processing times are linearly dependent on the waiting times of the jobs. The objective is to minimize the makespan. A 0-1 mixed integer program and a heuristic algorithm are proposed. Some cases solved in polynomial time and computational experiments are also provided. (C) 1999 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:365 / 378
页数:14
相关论文
共 7 条
[1]
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness