Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization

被引:43
|
作者
Huang, Song [1 ]
Tian, Na [1 ]
Wang, Yan [1 ]
Ji, Zhicheng [1 ,2 ]
机构
[1] Jiangnan Univ, Sch Internet Things Engn, 1800 Lihu Ave, Wuxi 214122, Jiangsu, Peoples R China
[2] Jiangnan Univ, Engn Res Ctr Internet Things Technol Applicat, Minist Educ, Wuxi 214122, Peoples R China
来源
SPRINGERPLUS | 2016年 / 5卷
基金
中国国家自然科学基金;
关键词
Flexible job shop scheduling; Particle swarm optimization; Variable neighborhood search; Non-dominated archive update strategy; BIOGEOGRAPHY-BASED OPTIMIZATION; HARMONY SEARCH ALGORITHM; GENETIC ALGORITHM; DISPATCHING RULES; TABU SEARCH;
D O I
10.1186/s40064-016-3054-z
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Taking resource allocation into account, flexible job shop problem (FJSP) is a class of complex scheduling problem in manufacturing system. In order to utilize the machine resources rationally, multi-objective particle swarm optimization (MOPSO) integrating with variable neighborhood search is introduced to address FJSP efficiently. Firstly, the assignment rules (AL) and dispatching rules (DR) are provided to initialize the population. And then special discrete operators are designed to produce new individuals and earliest completion machine (ECM) is adopted in the disturbance operator to escape the optima. Secondly, personal-best archives (cognitive memories) and global-best archive (social memory), which are updated by the predefined non-dominated archive update strategy, are simultaneously designed to preserve non-dominated individuals and select personal-best positions and the global-best position. Finally, three neighbor-hoods are provided to search the neighborhoods of global-best archive for enhancing local search ability. The proposed algorithm is evaluated by using Kacem instances and Brdata instances, and a comparison with other approaches shows the effectiveness of the proposed algorithm for FJSP.
引用
收藏
页数:22
相关论文
共 50 条
  • [41] A new multi-objective fully-informed particle swarm algorithm for flexible job-shop scheduling problems
    Jia, Zhao-hong
    Chen, Hua-ping
    Tang, Jun
    CIS WORKSHOPS 2007: INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY WORKSHOPS, 2007, : 191 - +
  • [42] A hybrid approach for multi-objective expanded job-shop scheduling problem based on artificial neural network and particle swarm optimization
    Yao, Yunping
    Chen, Xuixian
    Li, Youtang
    Zhao, Fuqing
    Proceedings of 2006 International Conference on Artificial Intelligence: 50 YEARS' ACHIEVEMENTS, FUTURE DIRECTIONS AND SOCIAL IMPACTS, 2006, : 86 - 91
  • [43] A Pareto archive particle swarm optimization for multi-objective job shop scheduling
    Lei, Deming
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 960 - 971
  • [44] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Frutos, Mariano
    Tohme, Fernando
    OPERATIONAL RESEARCH, 2013, 13 (02) : 233 - 250
  • [45] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Mariano Frutos
    Fernando Tohmé
    Operational Research, 2013, 13 : 233 - 250
  • [46] An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem
    Wang, Xiaojuan
    Li, Wenfeng
    Zhang, Ying
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2013, 47 (2-3) : 280 - 288
  • [47] A cloud based improved method for multi-objective flexible job-shop scheduling problem
    Ning, Tao
    Jin, Hua
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (01) : 823 - 829
  • [48] Study on Multi-objective Flexible Job-shop Scheduling Problem considering Energy Consumption
    Jiang, Zengqiang
    Zuo, Le
    Mingcheng E
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2014, 7 (03): : 589 - 604
  • [49] An object-oriented approach for multi-objective flexible job-shop scheduling problem
    Kaplanoglu, Vahit
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 45 : 71 - 84
  • [50] Improved NSGA-II for the multi-objective flexible job-shop scheduling problem
    Zhang C.
    Dong X.
    Wang X.
    Li X.
    Liu Q.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2010, 46 (11): : 156 - 164