Bayesian statistics and production reliability assessments for mining operations

被引:1
作者
Sharma, Gaurav [1 ]
Haukaas, Terje [1 ]
Hall, Robert A. [2 ]
Priyadarshini, Suraj [2 ]
机构
[1] Univ British Columbia, Dept Civil Engn, Vancouver, BC V6T 1Z4, Canada
[2] Univ British Columbia, Dept Min Engn, Vancouver, BC V6T 1Z4, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
mining operations; reliability analysis; Bayesian statistics;
D O I
10.1080/17480930902916262
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This article presents a novel application of structural reliability concepts to assess the reliability of mining operations. 'Limit-states' are defined to obtain the probability that the total productivity - measured in production time or economic gain - exceeds user-selected thresholds. Focus is on the impact of equipment downtime and other non-operating instances on the productivity and the economic costs of the operation. A comprehensive set of data gathered at a real-world mining facility is utilised to calibrate the probabilistic models. In particular, the utilisation of Bayesian inference facilitates the inclusion of data - and subsequent updating of the production probabilities - as more data become available. The article includes a description of the Bayesian approach, as well as the limit-state-based reliability methodology. A comprehensive numerical example demonstrates the methodology and the interpretation of the probabilistic results.
引用
收藏
页码:180 / 205
页数:26
相关论文
共 17 条
[1]  
Ang A.H., 2002, PROBABILITY CONCEPTS
[2]   A fully subjective approach to modelling inspection maintenance [J].
Apeland, S ;
Scarf, PA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 148 (02) :410-425
[3]  
Benjamin J., 1970, Probability, Statistics, and Decision for Civil Engineers
[4]  
Box G. E. P., 1992, BAYESIAN INFERENCE S, DOI DOI 10.1002/9781118033197.CH4
[5]   REDUCING PRODUCTION DOWNTIME USING DELAY-TIME ANALYSIS [J].
CHRISTER, AH ;
WALLER, WM .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1984, 35 (06) :499-512
[6]  
Chung T., 2004, P 2004 WINT SIM C WA
[7]  
Gupta S., 1999, INT J SURF MIN RECLA, V13, P111
[8]  
Hall R.A., 2003, INT J SURFACE MINING, V17, P139, DOI [DOI 10.1076/IJSM.17.3.139.14773, 10.1076/ijsm.17.3.139, DOI 10.1076/IJSM.17.3.139]
[9]   Strategies for finding the design point in non-linear finite element reliability analysis [J].
Haukaas, Terje ;
Kiureghian, Armen Der .
PROBABILISTIC ENGINEERING MECHANICS, 2006, 21 (02) :133-147
[10]  
Meeker W.Q., 2004, QUALITY TECHNOLOGY Q, V1, P1, DOI DOI 10.1080/16843703.2004.11673062