A case study of GAMM (graphical analysis for maintenance management) in the mining industry

被引:7
作者
Barbera, Luis [1 ]
Crespo, Adolfo [1 ]
Viveros, Pablo [2 ]
Stegmaier, Raul [2 ]
机构
[1] Univ Seville, Sch Engn, Dept Ind Management, Seville 41092, Spain
[2] Univ Tecn Federico Santa Maria, Dept Ind Engn, Valf Paraiso 1680, Chile
关键词
Mining industry; Maintenance optimization; Slurry pumps; Graphical data analysis; Efficiency and effectiveness in maintenance;
D O I
10.1016/j.ress.2013.07.017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a case for practical application of the GAMM method, which has been developed and published by the authors (Barbera L, Crespo A. and Viveros P.) The GAMM method supports decision-making in the overall maintenance management, through the visualization and graphical analysis of data. In addition, it allows for the identification of anomalous behavior in the equipment analyzed, whether derived from its own operations, maintenance activities, improper use of equipment or even as a result of design errors in the equipment itself. As a basis for analysis, the GAMM method uses a nonparametric estimator of the reliability function using all historical data or, alternatively, part of the history, allowing it to perform an analysis even with limited available data. In the case study developed, GAMM has been used to analyze two slurry pumps in a mining plant located in Chile. Both pumps are part of the same industrial process, which is described in Section 3, and both pumps had a higher failure rate but one more than the other. GAMM identified deficiencies in each of the pumps being studied, thus improving decision-making and problem solving process related to the maintenance of the pumps. Particularly, this work initially provides a description of the GAMM method (Section 1), and, afterwards, it is depicted with special attention the approach to the problem (Section 2). In Section 3, a background of the industrial context is presented. Then, Section 4 shows step by step the application of GAMM method. Finally, results and conclusions are presented in Section 5 where the main improvements obtained are summarized. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:113 / 120
页数:8
相关论文
共 7 条
  • [1] [Anonymous], 1969, J QUAL TECHNOL
  • [2] Advanced model for maintenance management in a continuous improvement cycle: integration into the business strategy
    Barbera, Luis
    Crespo, Adolfo
    Viveros, Pablo
    Stegmaier, Raul
    [J]. INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2012, 3 (01) : 47 - 63
  • [3] The Graphical Analysis for Maintenance Management Method: A Quantitative Graphical Analysis to Support Maintenance Management Decision Making
    Barbera Martinez, Luis
    Crespo Marquez, Adolfo
    Viveros Gunckel, Pablo
    Arata Andreani, Adolfo
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2013, 29 (01) : 77 - 87
  • [4] Birolini A., RELIABILITY ENG
  • [5] Crespo Marquez A, 2006, INT J MANAGEMENT SCI, V34, P325, DOI DOI 10.1016/L0MEGA.2004.11.003
  • [6] Moubray J., 1997, Reliability-centered Maintenance II, V2nd
  • [7] Rausand M, SYSTEM RELIABILITY T, P644